Acceptability of LNG Projects<br />

The GNPower<br />

Project Profile<br />

• 1200 MW LNG-fired Power Plant,<br />

60% efficiency<br />

– 4 LNG combustion turbines, 4<br />

heat recovery steam generators, 2<br />

steam turbines<br />

• High Voltage Direct Current<br />

(HVDC) submarine cable thru<br />

Manila Bay<br />

• 2 X 140,000 cubic meter LNG<br />

tanks<br />

• 250-meter Jetty<br />

• Project site is 45-Hectare coastal<br />

area in Barangay Alas-asin,<br />

Mariveles, Bataan