Quality Control Manual Page 1 of 4<br />

<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 0<br />

6.1.0 GENERAL<br />

SECTION 6<br />

WELDING <strong>CONTROL</strong><br />

6.1.1 This section outlines the basic elements of welding control within <strong>Industrial</strong> <strong>Piping</strong>,<br />

<strong>Inc</strong>.<br />

6.1.2 All welding performed on Code fabrication shall conform to the requirements of ASME<br />

Section IX with additional requirements of the applicable Section to which work is<br />

performed.<br />

6.2.0 WELDING PROCEDURE SPECIFICATIONS<br />

6.2.1 The Quality Control Manager has the responsibility for preparing the Welding<br />

Procedure Specifications. The essential, supplemental (if required), and non-essential<br />

variables are documented. A Welding Procedure Specification (WPS) will be revised<br />

whenever there is a change in any nonessential variable. The revision will be noted on<br />

the WPS and dated. A change in any essential variable or supplementary essential<br />

variable shall require requalification to be by another Procedure Qualification Record<br />

(PQR).<br />

6.2.2 The Quality Control Manager is responsible for conducting the qualification tests for<br />

the WPS and documenting the Procedure Qualification Record. Preparation and testing<br />

of the required specimens is performed to Section IX requirements by a testing<br />

laboratory. The Laboratory Test Results are reviewed by the Quality Control Manager,<br />

and if acceptable, he records the test results on the Procedure Qualification Record<br />

which he will date and certify. The Laboratory Test Reports will be maintained on file<br />

by the Quality Control Manager.<br />

6.2.3 The Fabrication Engineer is responsible for assigning the WPS for welding of new<br />

fabrication to the ASME Code and for repair or alteration welding to the National<br />

Board Inspection Code. The applicable WPS number shall be included on the Certified<br />

Drawing. In the case of dispositioning of in-process nonconformities involving welded<br />

repairs, the Quality Control Manager shall be responsible for assigning WPS's on the<br />

Nonconformance Report. (See 4.9.1 and 5.4.2).