25.04.2015 Views

QUALITY CONTROL MANUAL - Industrial Piping, Inc.

QUALITY CONTROL MANUAL - Industrial Piping, Inc.

QUALITY CONTROL MANUAL - Industrial Piping, Inc.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Quality Control Manual Page 1 of 2<br />

<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 1<br />

7.1.0 GENERAL<br />

SECTION 7<br />

NONDESTRUCTIVE EXAMINATION<br />

7.1.1 The purpose of this section is to describe the methods and procedures used by <strong>Industrial</strong><br />

<strong>Piping</strong>, <strong>Inc</strong>. to accomplish Nondestructive Testing and to assure these tests are<br />

performed by qualified personnel.<br />

7.1.2 The Fabrication Engineer shall be responsible for determining the NDE required by the<br />

applicable Code Sections, which shall be performed by qualified personnel. These<br />

requirements will be provided on the Certified Drawing.<br />

7.1.3 Each NDE Examiner shall have visual acuity to enable him/her to read Jaeger J-2<br />

letters at not less than 12". Eye exam to be administered annually.<br />

7.1.4 Radiography, UT and Magnetic Particle will be conducted by a qualified subcontractor.<br />

Liquid Penetrant, and Visual Examinations shall be performed by a qualified <strong>Industrial</strong><br />

<strong>Piping</strong>, <strong>Inc</strong>. employee or by a qualified subcontractor who will be certified by IPI.<br />

7.2.0 SUBCONTRACTED NDE<br />

7.2.1 <strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>.'s subcontracted Level III Examiners are appointed in writing by<br />

the President after review and acceptance of their written procedures, practices,<br />

calibration and personnel qualification and certification records by Quality Control<br />

Manager. It shall be the responsibility of the Level III Examiner to approve all<br />

subcontracted procedures and requalification of procedures when ever the essential<br />

variables change. Personnel qualification records for examiners used shall be retained<br />

on file by the Quality Control Manager.<br />

7.2.2 Radiography shall be performed in accordance with a standard written procedure which<br />

meets the requirements of ASME Section V and the other applicable Sections of the<br />

Code. All phases of film exposure, development, and interpretation shall come under<br />

the supervision of a Level II or Level III Examiner qualified per employers' written<br />

practice under the guidelines of SNT-TC-1A latest code accepted edition. The results<br />

will be recorded on a Radiograph Inspection Report. Verification that tests have been<br />

completed and accepted is also recorded on the IPI Traveler.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!