QUALITY CONTROL MANUAL - Industrial Piping, Inc.
QUALITY CONTROL MANUAL - Industrial Piping, Inc.
QUALITY CONTROL MANUAL - Industrial Piping, Inc.
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
INDUSTRIAL PIPING, INC.<br />
2794 OLD RICHBURG ROAD<br />
RICHBURG, SC 29729<br />
<strong>QUALITY</strong> <strong>CONTROL</strong> <strong>MANUAL</strong><br />
FOR<br />
ASME CODE CONSTRUCTION IN SHOP AND FIELD ASSEMBLY<br />
AND REPAIR OR ALTERATION<br />
OF PRESSURE VESSELS,<br />
BOILERS AND BOILER PARTS,<br />
PRESSURE PIPING, AND PROCESS PIPING<br />
IN ACCORDANCE WITH<br />
THE ASME BOILER & PRESSURE VESSEL CODE<br />
SECTION VIII, DIVISION 1<br />
SECTION I, B31.1, B31.3<br />
THE NATIONAL BOARD INSPECTION CODE<br />
AND JURISDICTIONAL AUTHORITY REQUIREMENTS<br />
ISSUE 2 REV. 1<br />
August 20, 2009<br />
ISSUED TO:<br />
<strong>MANUAL</strong> COPY NO.<br />
[ ] Controlled Copy<br />
[ X ] Uncontrolled Copy
Quality Control Manual<br />
Page ii<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 1<br />
Issue 2<br />
TABLE OF CONTENTS<br />
SECTION TITLE PAGE REV. DATE<br />
Cover Sheet 1 8/20/09<br />
Table of Contents 1 of 3 1<br />
Statement of Authority and Content 1 of 1 1<br />
1 Quality Control Program 0 9/5/08<br />
1.1.0 General 1 of 4 0<br />
1.2.0 Quality Control Manual 1 of 4 0<br />
1.3.0 Custody and Control of Code Symbol<br />
Stamps 2 of 4 0<br />
1.4.0 Duties and Responsibilities of<br />
Personnel 2 of 4 0<br />
1.5.0 Organizational Chart 4 of 4 0<br />
2 Drawings, Design Calculations<br />
and Specifications 0 9/5/08<br />
2.1.0 General 1 of 2 0<br />
2.2.0 Control of Drawings, Design<br />
Calculations and Specifications 1 of 2 0<br />
2.3.0 Calculation Control 2 of 2 0<br />
3 Material Control 1 8/20/09<br />
3.1.0 General 1 of 4 1<br />
3.2.0 Control of Purchases 1 of 4 1<br />
3.3.0 Receiving Control 2 of 4 1<br />
3.4.0 Material Certifications and<br />
Partial Data Reports 2 of 4 1<br />
3.5.0 Identification 3 of 4 1<br />
3.6.0 Release of Material 3 of 4 1<br />
3.7.0 Field Material Control 4 of 4 1<br />
4 Examination, Inspection, and Testing 1 8/20/09<br />
4.1.0 General 1 of 5 1<br />
4.2.0 Travelers, Certified Drawings, and<br />
Inspection Points 1 of 5 1<br />
4.3.0 Release of Material for<br />
Fabrication 1 of 5 1<br />
4.4.0 Authorized Inspector Notification 1 of 5 1
Quality Control Manual<br />
Page iii<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 1<br />
TABLE OF CONTENTS<br />
SECTION TITLE PAGE REV. DATE<br />
4.5.0 In Process Inspections 2 of 5 1 8/20/09<br />
4.6.0 Final Inspection 3 of 5 1<br />
4.7.0 Hydrostatic Testing 3 of 5 1<br />
4.8.0 Pneumatic Testing 3 of 5 1<br />
4.9.0 Welded Repairs 4 of 5 1<br />
4.10.0 Data Reports and Stamping 4 of 5 1<br />
4.11.0 Distribution & Retention of Data 4 of 5 1<br />
Reports<br />
4.12.0 Field Site Program 5 of 5 1<br />
5 Correction of Nonconformities 1 8/20/09<br />
5.1.0 General 1 of 2 1<br />
5.2.0 Definition 1 of 2 1<br />
5.3.0 Affected Hardware Treatment 1 of 2 1<br />
5.4.0 Procedure 1 of 2 1<br />
5.5.0 Records 2 of 2 1<br />
6 Welding Control 0 9/5/08<br />
6.1.0 General 1 of 4 0<br />
6.2.0 Welding Procedure Specifications 1 of 4 0<br />
6.3.0 Welder/Welding Operator Qualifications 2 of 4 0<br />
6.4.0 Weld Filler Material Control 2 of 4 0<br />
6.5.0 Welder/Welding Operator Identification<br />
Number 3 of 4 0<br />
6.6.0 Tackwelds 4 of 4 0<br />
6.7.0 Assignment of Welders/Welding<br />
Operators for Welding 4 of 4 0<br />
7 Nondestructive Examination 1 8/20/09<br />
7.1.0 General 1 of 2 1<br />
7.2.0 Subcontracted NDE 1 of 2 1<br />
7.3.0 Liquid Penetrant, Magnetic Particle,<br />
and Visual Examinations 2 of 2 1<br />
7.4.0 Authorized Inspectors' Involvement 2 of 2 1
Quality Control Manual<br />
Page iv<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 1<br />
TABLE OF CONTENTS<br />
SECTION TITLE PAGE REV. DATE<br />
8 Heat Treatment 0 9/5/08<br />
8.1.0 General 1 of 1 0<br />
8.2.0 Procedure 1 of 1 0<br />
9 Calibration 0 9/5/08<br />
9.1.0 General 1 of 1 0<br />
9.2.0 Pressure Gages 1 of 1 0<br />
9.3.0 Micrometers 1 of 1 0<br />
10 Records Retention 0 9/5/08<br />
10.1.0 General 1 of 1 0<br />
10.2.0 Records Distribution and Retention 1 of 1 0<br />
11 Repairs and Alterations 0 9/5/08<br />
11.1.0 General 1 of 4 0<br />
11.2.0 Definitions 1 of 4 0<br />
11.3.0 Responsibility 2 of 4 0<br />
11.4.0 Procedures 2 of 4 0<br />
11.5.0 Records 2 of 4 0<br />
11.6.0 Stamping 3 of 4 0<br />
11.7.0 Distribution of NBIC Forms 4 of 4 0<br />
12 The Authorized Inspector 0 9/5/08<br />
12.1.0 General 1 of 2 0<br />
12.2.0 Definition 1 of 2 0<br />
12.3.0 Involvement with the Authorized 1 of 2 0<br />
Inspector<br />
13 Exhibits - Table of Contents 1 of 1 0 9/5/08<br />
APPROVED BY:<br />
<strong>QUALITY</strong> <strong>CONTROL</strong> MANAGER<br />
ACCEPTED BY:<br />
AUTHORIZED INSPECTOR<br />
DATE<br />
DATE
Quality Control Manual Page 1 of 1<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 1<br />
STATEMENT OF AUTHORITY AND CONTENT<br />
This Manual establishes the Quality Control System to be applied to the Construction, Repair or<br />
Alteration of Pressure Vessels, Boilers, Boiler Parts, Pressure <strong>Piping</strong>, and Related Parts, produced in<br />
compliance with the requirements of ASME Code, Sections VIII, Division 1 and Section I, B31.1,<br />
Jurisdiction and the National Board Inspection Code. This Manual has been reviewed and approved by<br />
the Quality Control Manager of <strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Any subsequent proposed changes and/or<br />
revisions will also be reviewed and approved in the same manner. This manual may also be used for<br />
compliance to ASME B31.3 – Process <strong>Piping</strong> Code.<br />
It is recognized that this Quality Control System involves the team effort of all Departments,<br />
Supervisors, and Personnel in the Fabrication & Repair or Alteration of shop and field Code items.<br />
This program will be followed and enforced on all applicable work. Any problems or conflicts<br />
concerning this system which cannot be resolved by the Managers involved shall be presented to me<br />
for resolution, which shall not negate Code requirements or this Manual.<br />
The Quality Control Manager shall have the responsibility, the authority, and the organizational<br />
freedom to identify quality control problems and to initiate, recommend and provide solutions.<br />
Final responsibility for this Manual program and the authority to enforce it, has been assigned by the<br />
President to the Quality Control Manager.<br />
M. L. Jones Date<br />
President
Quality Control Manual Page 1 of 4<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 0<br />
1.1.0 GENERAL<br />
SECTION 1<br />
<strong>QUALITY</strong> <strong>CONTROL</strong> PROGRAM<br />
1.1.1 This section documents the measures undertaken by <strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. for the<br />
purpose of assuring compliance with the provisions of the ASME Code Section I, VIII,<br />
Division 1, B31.1, Jurisdiction, N.B.I.C., and B31.3.<br />
Note: All work performed in accordance with ASME B31.3 is exempt from any/all<br />
involvement of the A.I./C.I. where any/all reference to the other A.I./C.I., data reports<br />
and stamping is implied in this manual these shall be exclusive of ASME B31.3.<br />
1.2.0 <strong>QUALITY</strong> <strong>CONTROL</strong> <strong>MANUAL</strong><br />
1.2.1 Internal issue of the Q.C. Manual to <strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. personnel and to the<br />
Authorized Inspector shall be controlled. Such manuals shall be serialized, and the<br />
recipient assigned his/her own manual serial number, and the revision and date of issue<br />
shall be entered in a Master Issue Log-Controlled (Exhibit A) maintained by the<br />
Quality Control Manager.<br />
1.2.2 Uncontrolled copies of the Q. C. Manual will not be issued to company employees.<br />
When requested by an outside organization they will be issued an uncontrolled copy of<br />
the Q. C. Manual. This copy will be marked “Uncontrolled Copy” on the cover page.<br />
1.2.3 Responsibility for revisions to the Quality Control Manual shall be with the Quality<br />
Control Manager. A review of each ASME and NBIC Code Edition and Addenda will<br />
be made after its receipt to determine its effect on this program. Required revisions<br />
shall be implemented within 6 months of issue date and documented by initialing and<br />
dating the applicable document.<br />
Revisions will be drafted for those manual sections whose content is made inadequate<br />
by Code changes, or by development of new internal control systems. Revised text<br />
shall be italicized. Following approval of such drafts by QC Manager on Table of<br />
Contents, copies of the draft sections and of the existing sections it is intended to<br />
replace, shall be submitted to the Authorized Inspector with an approved copy of the<br />
Table of Contents. Upon acceptance of the draft by the Authorized Inspector and his<br />
signature on table of contents page, it shall be issued for printing and implementation.<br />
The QC Manager, at his discretion, may change the Issue level of the Manual. At<br />
which time, all revisions will revert to zero.
Quality Control Manual Page 2 of 4<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 0<br />
1.2.4 If customers specify changes which do not affect any rules or requirements of the<br />
ASME Code, project addenda are initiated which clearly indicate the<br />
customer and IPI job they cover. When the content of such addenda is mutually agreed<br />
to between IPI and the specific customer and submitted to the A.I. For the AIA of<br />
record for his review, the addenda is issued on colored pages to manual holders who are<br />
involved with the specific material being changed. This issue is by internal memo,<br />
requesting the addenda to be applied to the specific contract only, and a copy retained<br />
in the job file after completion. It shall be the Quality Control Manager's responsibility<br />
to retrieve the project addenda and restore the Quality Control Manual to its original<br />
content.<br />
1.2.5 A controlled copy of the latest revision of the Quality Control Manual will be made<br />
available to the Authorized Inspector, at the plant and at field sites.<br />
1.3.0 CUSTODY AND <strong>CONTROL</strong> OF CODE SYMBOL STAMPS<br />
1.3.1 The Quality Control Manager is responsible for custody and control of the Code<br />
Symbol Stamps. He shall maintain the Stamps in a secure place. The Quality Control<br />
Manager is responsible for the correct application of the Code Symbol Stamps.<br />
1.3.2 After the Authorized Inspector has made his final inspection, he will be presented with<br />
a completed Manufacturers' Data Report signed by the Quality Control Manager. Any<br />
records he may require will also be presented. When he is satisfied that all Code<br />
requirements have been met, he may sign and date the Manufacturer's Data Report.<br />
The A.I. will witness the application of the Code Symbol Stamp.<br />
1.4.0 DUTIES AND RESPONSIBILITIES OF PERSONNEL<br />
1.4.1 The Quality Control Manager shall be responsible for overall enforcement of the<br />
Quality Control Program. His responsibilities include QC Manual Control; distribution<br />
of Code Sections, Editions, Addenda, and Code Cases; final arbitration of conflicts<br />
through the President as may be necessary; Nonconformance Reports; assurance that all<br />
inspections, examinations, and tests are performed, found acceptable as required by the<br />
Code, and documented by signing and dating the Travelers; calibration of test<br />
equipment; notification of the Authorized Inspector; receiving inspection; custody of<br />
Code Symbol Stamps; and certification of Manufacturers' Data Reports or applicable<br />
NBIC Form.
Quality Control Manual Page 3 of 4<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 0<br />
1.4.2 The Fabrication Engineer is responsible for assuring that drawings, calculations, and<br />
various procedures are accurate and that all required tests, inspections, and<br />
examinations are clearly defined.
Quality Control Manual Page 1 of 2<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 0<br />
2.1.0 GENERAL<br />
SECTION 2<br />
DRAWINGS, DESIGN CALCULATIONS, AND SPECIFICATIONS<br />
2.1.1 The <strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Quality Control System provides for procedures which<br />
ensure that the proper design information required by the ASME Code is used for<br />
construction, examination, and testing of fabricated Code items. (Fabrication as<br />
referenced throughout this QC Manual also pertains to Repairs and Alterations in the<br />
shop and in the field.)<br />
2.2.0 <strong>CONTROL</strong> OF DRAWINGS, DESIGN CALCULATIONS AND SPECIFICATIONS<br />
2.2.1 The Fabrication Engineer shall have the responsibility for review of the customer's<br />
calculations, specifications, and drawings to assure Code compliance can be attained.<br />
Preparation of design calculations and drawings, if not supplied by the customer, shall<br />
be made by the Fabrication Engineer using appropriate formulas required by the Code.<br />
All drawings and calculations are reviewed by the Quality Control Manager and<br />
submitted to the A.I prior to the start of fabrication so that he may designate his<br />
required Inspection Points on the IPI Traveler (Exhibit B). The Certified Drawing<br />
contains all essential information necessary to fabricate Code items as well as that<br />
information needed for examination, inspection and testing.<br />
2.2.2 Job order numbers are assigned by the Manager Administration. Each Division<br />
Manager is responsible for the drawings numbering system. These systems are in the<br />
form of running logs.<br />
2.2.3 The Fabrication Engineer is responsible for specifying materials to be used in ASME<br />
Code fabrication. The Fabrication Engineer prepares a Requisition (Exhibit C) listing<br />
all material and technical procurement requirements.<br />
2.2.4 The Fabrication Engineer releases the job by sending Certified Drawings and a job<br />
package (as described in Paragraph 4.3.1 of this Manual) to the Shop Superintendent<br />
for shop work or to the Field Superintendent for field work. A copy of the Certified<br />
Drawing is forwarded to the Quality Control Manager. In the event of a drawing<br />
change, the changes shall be redlined and the drawings shall be revised with revisions<br />
noted and delivered to the Shop or Field Superintendent and the Quality Control<br />
Manager. The Authorized Inspector shall be advised of the revisions by the Quality<br />
Control Manager. The superseded drawings shall be collected by the Fabrication<br />
Engineer and any copies not destroyed will be marked "VOID" and one copy retained<br />
in engineering job file.
Quality Control Manual Page 2 of 2<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 0<br />
2.2.5 The Fabrication Engineer will signify his approval of all drawings and revisions by his<br />
stamping and date in the area provided. The Drawing shall contain all essential<br />
information necessary to fabricate and test Code work, including dimensions,<br />
tolerances material specifications, welding procedures, weld symbols, NDE<br />
requirements, hydrostatic testing requirements, design information, Code Section<br />
Edition and Addenda and Code Case (if applicable).<br />
2.3.0 CALCULATION <strong>CONTROL</strong><br />
2.3.1 When standard or computer aided design calculations are used for company designed<br />
Code items, the Fabrication Engineer is responsible for the input of correct design data<br />
and the verification that the correct output has been obtained.<br />
2.3.2 The Fabrication Engineer will review the applicable Code to determine if standard<br />
designs or computer software programs are affected, and that they meet the Section,<br />
Edition, and Addenda applicable for design and shall be documented on the design<br />
printout.<br />
2.3.3 All calculations as issued shall be reviewed and approved by the Quality Control<br />
Manager, and documented on the IPI Traveler. In the event revisions are made, the<br />
Quality Control Manager shall review and approve each affected document. The<br />
Fabrication Engineer is responsible for distribution of all revisions and collecting all<br />
void calculations and marking as such.<br />
2.3.4 Standard and computer aided calculations are available for review and acceptance by<br />
the Authorized Inspector. The Fabrication Engineer shall provide the Authorized<br />
Inspector with any alternative methods of calculations that the A.I. may request.<br />
2.3.5 The Fabrication Engineer is responsible to assure the security of the computer program<br />
to prevent tampering and its unauthorized use.
Quality Control Manual Page 1 of 4<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 1<br />
SECTION 3<br />
3.1.0 GENERAL<br />
MATERIAL <strong>CONTROL</strong><br />
3.1.1 This section establishes the measures used to control materials used to fabricate Code<br />
items.<br />
3.1.2 The materials used in the fabrication of Code items shall conform to the specifications<br />
and stress tables in Section II, Part D and B31.1 of the Code, along with those<br />
requirements specific to B31.3 fabricated piping, and be acceptable in the applicable<br />
Code section.<br />
3.2.0 <strong>CONTROL</strong> OF PURCHASES<br />
3.2.1 The Fabrication Engineer is responsible for listing materials for the job on the<br />
Requisition (Exhibit C). All materials for Code work shall be procured using a<br />
Purchase Order (Exhibit D) prepared from the Requisition issued by the Fabrication<br />
Engineer. Only the Fabrication Engineer, with approval of the Quality Control Manager<br />
and the concurrence of the A.I. shall have the authority to approve material<br />
substitutions. Material substitutions must meet applicable Code and design<br />
requirements. Revisions to design documents must be completed as specified in<br />
Section 2 of this Manual.<br />
3.2.2 The Purchase Orders shall contain all necessary information required by the applicable<br />
ASME Code material specification, job requirement and required Product Markings<br />
and Documents. The PO shall also contain any special testing required at receiving or<br />
during fabrication.<br />
3.2.3 All Purchase Orders for Code materials shall require that Material Certification be<br />
furnished on materials when required by the Code. In the case of materials from stock,<br />
it shall be the Quality Control Manager's responsibility to affirm that materials have<br />
traceability to Material Certifications that are on file and in compliance with the current<br />
Code and job design requirements. He shall note his approval of materials by initialing<br />
and dating the Requisition and the Material Certification.<br />
3.2.4 The Purchasing Agent and Fabrication Engineer are responsible for checking the<br />
Purchase Orders for correctness against the Requisitions prior to issue. A copy of the<br />
Purchase Order is forwarded to the Shipping/Receiving Clerk and one copy goes to a<br />
centralized job file.
Quality Control Manual Page 2 of 4<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 1<br />
3.2.5 All Purchase Orders for Code Fabrication, shall reference the <strong>Industrial</strong> <strong>Piping</strong> <strong>Inc</strong>. job<br />
number for which the material is being procured.<br />
3.2.6 Purchase Orders for cold formed carbon and low alloy steels shall contain a statement<br />
that they were properly formed to specified shapes (such as UG-79).<br />
3.3.0 RECEIVING <strong>CONTROL</strong><br />
3.3.1 The Shipping/Receiving Clerk is responsible for the receipt, identification, and marking<br />
of material. Upon receipt, the IPI job number is marked on each item. Material is<br />
checked by the Shipping/Receiving Clerk against the appropriate Purchase Order for<br />
verification of item descriptions and quantities.<br />
3.3.2 Material is inspected by Quality Control Inspector upon receipt to ensure that it is<br />
properly stamped, stenciled, or otherwise marked with manufacturer's identification and<br />
Heat No./Code information and job number. The Quality Control Manager shall<br />
physically examine each item of material, making dimensional checks, and inspecting<br />
for damage and defects, comparing same with Purchase Orders, vendors shipping<br />
papers, and Material Certifications to affirm Code compliance and so indicate on the<br />
Receiving Inspection Report (Exhibit E). Material taken from inventory will be treated<br />
as described in this paragraph, including the completion of the Receiving Inspection<br />
Report.<br />
3.3.3 Materials found at receiving inspection to be nonconforming are documented and<br />
resolved as described in Section 5, Correction of Nonconformities.<br />
3.4.0 MATERIAL CERTIFICATIONS AND PARTIAL DATA REPORTS<br />
3.4.1 The Material Certifications will be reviewed by the Quality Control Manager for<br />
compliance to Section II of the ASME Code and he will note his review by initialing<br />
and dating the Receiving Inspection Report which references the job number and<br />
Purchase Order numbers. The Material Certifications will be included in the QC job<br />
file and available to the Authorized Inspector for review.
Quality Control Manual Page 3 of 4<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 1<br />
If the Material Certification is found to be nonconforming, the material will be marked<br />
as per Section 5, Control of Nonconformities.<br />
3.4.2 A Partial Data Report is required to accompany parts in which welding has been<br />
performed by someone other than <strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. The Partial Data Report will be<br />
reviewed by the Quality Control Manager and made available to the Authorized<br />
Inspector. A copy of this report will be attached to the Manufacturer's Data Report<br />
issued by IPI.<br />
3.5.0 IDENTIFICATION<br />
3.5.1 All plate and piping materials received that satisfy the Code, Purchase Order and<br />
Material Test Report requirements and have no defects or damage, shall be identified<br />
by assigning, in sequential order, an alpha-numeric code. This alpha-numeric code shall<br />
identify the material with the name or trademark of the manufacturer and any other<br />
markings as required by Code. This alpha-numeric code will be written on Material<br />
Test Reports for traceability. This identification number will then be applied to the<br />
material. All plate or pipe without such markings shall be utilized for Non-Code<br />
applications only. All coded material and associated documentation shall be reviewed<br />
and approved by the Quality Control Manager. Any coded marking system used must<br />
receive acceptance by the Authorized Inspector.<br />
3.5.2 Miscellaneous pressure parts will be marked with the name or trademark of the<br />
manufacturer and any other markings as are required by Code.<br />
3.5.3 Non pressure retaining parts welded to pressure retaining parts shall be marked in a<br />
manner that identifies the material to a specific ASME Section II material specification.<br />
3.6.0 RELEASE OF MATERIAL FOR FABRICATION<br />
3.6.1 The Certified Drawing contains Code designated materials required to construct the<br />
assembly. Prior to fabrication, the materials are compared to the Requisition to verify<br />
their acceptability for intended use. The Quality Control Manager shall indicate those<br />
materials released for fabrication by initialing on the shop copy of the Requisition.
Quality Control Manual Page 4 of 4<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 1<br />
3.7.0 FIELD MATERIAL <strong>CONTROL</strong><br />
3.7.1 All materials are procured, inspected, and identified at the shop location in accordance<br />
with this section as Code items, and marked for the job. The accepted material will<br />
then be shipped to the field site with all appropriate documentation. The material will<br />
then be inspected at the field site for any damage that may have occurred during<br />
shipment and for maintenance of identification.<br />
3.7.2 The Field Superintendent is responsible for the storage, handling and the release of this<br />
material at the job site.
Quality Control Manual Page 1 of 5<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 1<br />
4.1.0 GENERAL<br />
SECTION 4<br />
EXAMINATION, INSPECTION, AND TESTING<br />
4.1.1 This section describes the Quality Controls exercised during fabrication operations.<br />
Provisions are included so that the Authorized Inspector and Quality Control can<br />
determine at what operations, Inspection Points are to be performed.<br />
4.2.0 TRAVELERS, CERTIFIED DRAWINGS, AND INSPECTION POINTS<br />
4.2.1 The IPI Traveler outlines the operations, inspections, tests and Nondestructive<br />
Examinations that are to be performed and provides for documentation and sign-offs for<br />
Quality Control Personnel and the Authorized Inspector. The Certified Drawing<br />
contains all essential information necessary to fabricate Code items as well as that<br />
information needed for examination, inspection, and testing.<br />
4.2.2 Review of the IPI Traveler, Certified Drawings, and calculations by the Authorized<br />
Inspector prior to fabrication, with the Quality Control Manager, serves as the<br />
opportunity to establish Inspection Points. These will be documented by initial and date<br />
on the IPI Traveler that accompanies the drawing through all phases of fabrication.<br />
4.3.0 RELEASE OF MATERIAL FOR FABRICATION<br />
4.3.1 Work shall begin on Code fabrication when the Quality Control Manager has given<br />
release of materials to the Shop/Field Superintendent by indicating such on the<br />
Requisition and the Fabrication Engineer has forwarded to the field/shop a Job Order<br />
Package. The Job Order Package includes but is not limited to a Certified Drawing, a<br />
copy of the Requisition, a description of the Code Item on the Job Release Memo<br />
(Exhibit F), and the IPI Traveler.<br />
4.4.0 AUTHORIZED INSPECTOR NOTIFICATION<br />
4.4.1 It shall be the responsibility of the Quality Control Manager to notify the Authorized<br />
Inspector of any pending inspection points that will require his inspection.
Quality Control Manual Page 2 of 5<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 1<br />
4.5.0 IN PROCESS INSPECTIONS<br />
4.5.1 It shall be the responsibility of the Quality Control Manager to question and "HOLD"<br />
any Code fabrication considered nonconforming with ASME Code. See Section 5,<br />
Control of Nonconformities.<br />
4.5.2 The Quality Control Manager shall assist in the layout of Code materials to be cut,<br />
sheared, or burned into two or more parts. He shall verify the transfer of material<br />
identifications to all parts prior to the cutting operation. The Quality Control Inspector<br />
shall be responsible for recording the Heat Numbers or alpha-numeric code on the<br />
Traveler or Certified Drawing at time of fit-up. He shall also make dimensional checks<br />
to assure proper location of materials to be joined.<br />
4.5.3 The Quality Control Inspector shall be responsible for making inspections of Code<br />
fabrication. He shall check fit-up and tack welding for compliance with the Code. No<br />
welding, except tack welding used for fit-up, shall be permitted until the QC Inspector<br />
releases the Code work for welding. The Quality Control Inspector shall document his<br />
inspection and release for welding by initialing and dating the IPI Traveler. This form<br />
will be available to the Authorized Inspector for his initials and date at time of<br />
inspection.<br />
4.5.4 Upon release for welding, the welding will be done in accordance with Weld Procedure<br />
Specifications listed on the Certified Drawing. Placement of WPS numbers on the<br />
Certified Drawing shall be the responsibility of the Fabrication Engineer. Welding<br />
Procedure Specifications shall be located in work areas for ready reference by all who<br />
need them. The Quality Control Manager shall randomly monitor the welding to assure<br />
it is performed in accordance with proper procedures by qualified personnel in<br />
accordance with the ASME Code.<br />
4.5.5 Nondestructive Examinations as required by the Code and delineated on the Certified<br />
Drawing by the Fabrication Engineer, shall be performed and accepted prior to the<br />
performance of final inspection and hydrostatic testing. The Quality Control Manager<br />
shall be responsible for the review of resulting NDE Reports for Code compliance. He<br />
shall document his review by initialing and dating the IPI Traveler.
Quality Control Manual Page 3 of 5<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 1<br />
4.6.0 FINAL INSPECTION<br />
4.6.1 Upon completion of welding, and all required NDE, the Superintendent will advise the<br />
Quality Control Manager and a final inspection shall be made by the QC Manager. As<br />
a minimum, the QC Manager shall perform a inspection of all welds and materials,<br />
check dimensions, and verify correctness of the nameplate data. He shall document his<br />
inspections by initialing and dating the IPI Traveler. This will release the work for<br />
hydrostatic testing.<br />
4.7.0 HYDROSTATIC TESTING<br />
4.7.1 After Code work has been completed it shall be subjected to a pressure test (see IPI-ES-<br />
10 for vessels and IPI-ES-22 for boilers), using water at ambient temperature, but at<br />
least 30 degrees F above the minimum design metal temperature for pressure vessels<br />
and 70 degrees F minimum for boilers. The Shop Superintendent will be responsible for<br />
tests performed in the shop, while the Field Superintendent will be responsible for those<br />
performed in the field. The test pressure shall be gradually raised to that specified on<br />
the Certified Drawing. The pressure shall be under proper control at all times so that<br />
the required test pressure is attained, but not overly exceeded. The pressure shall be<br />
held for at least 10 minutes at which time it may be reduced for inspection. The metal<br />
temperature shall not exceed 120 degrees F during the examination.<br />
4.7.2 The hydrostatic test will be witnessed and accepted by the Quality Control Manager<br />
and the Authorized Inspector. Verification that the test has been completed and<br />
accepted shall be made by initialing and dating the IPI Traveler.<br />
4.7.3 The calibrated hydrostatic test gages should have dials graduated over a range of about<br />
2 times the maximum test pressure, but in no case less than 1 and a half times nor more<br />
than 4 times that pressure. The spacing between graduations shall be such that the<br />
inspector and the operator controlling the test shall be able to determine when the<br />
required test pressure has been applied.<br />
4.8.0 PNEUMATIC TESTING<br />
4.8.1 In the event of Pneumatic Testing of pressure vessel, see IPI procedure IPI-ES-21, or<br />
IPI-ES-17 for B31.3.
Quality Control Manual Page 4 of 5<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 1<br />
4.9.0 WELDED REPAIRS<br />
4.9.1 Welded repairs to pressure retaining parts or materials are considered to be<br />
nonconformities, as described in Section 5 of the Manual.<br />
4.10.0 MANUFACTURER'S DATA REPORTS AND STAMPING<br />
4.10.1 After the Authorized Inspector has made his final inspection, he will be presented with<br />
a completed Manufacturers' Data Report signed by the Quality Control Manager. Any<br />
records he may require will also be presented. When he is satisfied that all Code<br />
requirements have been met, he may sign and date the Manufacturer's Data Report.<br />
The A.I. will witness (Section I) the application of the Code Symbol Stamp.<br />
4.10.2 The Code Symbol Stamp will be kept by the QC Manager when not in use. When the<br />
Code Symbol Stamp is required in the shop or at a field site the QC Manager will issue<br />
it to the Shop/Field Superintendent or the QC Inspector will obtain the Code Symbol<br />
Stamp from the QC Manager. After usage the Code Symbol Stamp will be returned to<br />
the QC Manager.<br />
4.10.3 The Quality Control Manager is responsible for preparation, correctness, and<br />
certification of the Manufacturers' Data Report prior to presentation to the Authorized<br />
Inspector for this signature. The QC Manager is also responsible for checking the<br />
correctness of nameplate data or stamping on the vessel.<br />
4.11.0 DISTRIBUTION AND RETENTION OF MANUFACTURER'S DATA REPORTS<br />
4.11.1 The distribution of Manufacturers' Data Reports to the user or designated agent and<br />
Authorized Inspector upon request is the responsibility of the Quality Control Manager.<br />
4.11.2 Boilers and pressure vessels fabricated to the ASME Code may be registered with the<br />
National Board of Boiler and Pressure Vessel Inspectors. National Board numbers shall<br />
be controlled and issued in sequence, without skips or gaps of unused numbers or<br />
duplication, by the Quality Control Manager following the final pressure test. He shall<br />
maintain a record showing date issued, date mailed to National Board, and type of<br />
equipment manufactured, serial number and National Board Number.
Quality Control Manual Page 5 of 5<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 1<br />
The Quality Control Manager shall submit to the National Board the original copy of all<br />
Manufacturers' Data Reports required for Code stamped boilers and pressure vessels<br />
within 60 days of certification.<br />
4.12.0 FIELD SITE PROGRAM<br />
4.12.1 It shall be the responsibility of the Quality Control Manager to assure compliance with<br />
this Quality Control Manual for work performed at the field job site.<br />
4.12.2 All drawings, design calculations, and specifications are made available to the<br />
Authorized Inspector by the QC Manager, prior to the start of field work so that the A.I<br />
may designate on the IPI Traveler his required Inspection Points. The QC Manager<br />
shall notify the A.I. when any Inspection Points are ready for his inspection.<br />
4.12.3 The QC Manager shall, upon request, arrange for the A.I. to have access to those places<br />
where work under his jurisdiction is being performed.<br />
4.12.4 The QC Field Inspector is responsible to the Quality Control Manager for<br />
implementation and operation of the Quality Control System in the field.<br />
4.12.5 All welding performed in the field shall conform to the requirement of ASME Section<br />
IX with additional requirements of the applicable Code section. Reference Section 6 of<br />
this Manual.<br />
4.12.6 The Fabrication Engineer shall be responsible for determining the Nondestructive<br />
Examination required by the applicable Code Sections. These NDE requirements will<br />
be provided on the Certified Drawing. NDE will be accomplished as described in<br />
Section 7 of this Manual.<br />
4.12.7 The Field Superintendent will be responsible for conducting the final pressure test.<br />
Paragraphs 4.7.0 and 4.8.0 of this Manual delineate the procedure for performing final<br />
pressure tests.<br />
4.12.8 Nonconformities such as repairs to pressure retaining parts or materials will be referred<br />
to the Authorized Inspector prior to performing corrective action as described in<br />
Section 5 of this manual.
Quality Control Manual Page 1 of 2<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 1<br />
5.1.0 GENERAL<br />
SECTION 5<br />
CORRECTION OF NONCONFORMITIES<br />
5.1.1 <strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. maintains a system by which nonconforming items are identified,<br />
tagged, dispositioned, and corrective action taken in order to assure that nonconforming<br />
items are not inadvertently used in fabrication or shipped.<br />
5.2.0 DEFINITION<br />
5.2.1 A nonconformity is any condition which does not comply with the applicable rules of<br />
the ASME Code, Jurisdiction, NBIC or this QC Manual.<br />
5.2.2 Weld repairs to production welds (not including repairs to base material) are not<br />
covered by Nonconformance Reports. These shall be repaired using a Qualified WPS<br />
and a Qualified Welder and re-examined in accordance with the same method used to<br />
find the discontinuity.<br />
5.3.0 AFFECTED HARDWARE TREATMENT<br />
5.3.1 If a nonconformity is identified on an item prior to use (i.e. at receiving), the item shall<br />
be identified and not released for fabrication.<br />
5.3.2 If a nonconformity is identified on the item during the course of fabrication, activities<br />
which affect the resolution shall be stopped and not resumed until the resolution of the<br />
nonconformity has been completed. Activities which do not affect the resolution of the<br />
nonconformity may continue. The QC Manager shall be responsible for determining<br />
which activities may proceed with the AI's concurrence.<br />
5.3.3 A nonconforming item may be moved to different locations to facilitate storage and<br />
inspection, or it may be stored in place. Nonconformities will be clearly identified.<br />
5.4.0 PROCEDURE<br />
5.4.1 A Nonconformance Report (NCR - Exhibit G), and a Hold Tag (Exhibit H) or Hold<br />
marking, shall be utilized for all nonconformities. The NCR will be filled out by the<br />
Quality Control Manager stating the nonconforming characteristics of the item, and<br />
other appropriate information required to identify the item. If the nonconformity is<br />
found prior to use, a copy of the NCR shall be attached to the Requisition. If found<br />
during the course of fabrication a copy of the NCR shall be attached to the IPI Traveler.<br />
The Hold Tag shall be attached to the
Quality Control Manual Page 2 of 2<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 1<br />
nonconforming hardware. This will be the responsibility of the QC Manager.<br />
5.4.2 Responsibility for disposition of nonconformities shall lie with the Quality Control<br />
Manager or Fabrication Engineer. The item may be reworked, repaired, scrapped,<br />
returned to the vendor, or used as is (may only be used when those items meeting all<br />
Code requirements and then only with design justification). The Authorized Inspector<br />
shall be consulted on disposition of in-process nonconformities involving weld repairs.<br />
The Quality Control Manager is responsible for assigning the Welding Procedure<br />
Specification for welded repairs. The disposition shall be documented on the<br />
Nonconformance Report.<br />
5.4.3 The Nonconformance Report shall be submitted to the Authorized Inspector for his<br />
review of the disposition and assignment of Inspection Points prior to commencement<br />
of corrective action. These will be documented on the Nonconformance Report.<br />
5.4.4 Corrective action shall be performed in accordance with the assigned disposition unless<br />
it is discovered that the disposition is not adequate to properly resolve the<br />
nonconformity, in which case the Quality Control Manager shall provide a revised<br />
disposition. The Quality Control Manager shall be responsible for coordination of the<br />
Authorized Inspector's Inspection Points with performance of the corrective action.<br />
5.4.5 Upon completion of corrective action, the Quality Control Manager shall perform a<br />
final inspection. If final A.I. concurrence is required, the Quality Control Manager<br />
shall obtain this prior to releasing the nonconformity. Acceptance of this corrective<br />
action shall be documented by the Quality Control Manager and the Authorized<br />
Inspector on the Nonconformance Report. The Hold Tag or marking shall then be<br />
removed from the hardware by the Quality Control Manager and the item returned to<br />
fabrication.<br />
5.5.0 RECORDS<br />
5.5.1 A Nonconformity Log (Exhibit I) shall be maintained by the Quality Control Manager.<br />
Copies of the Nonconformance Reports shall be maintained by the Quality Control<br />
Manager. The Nonconformity Log shall be available to the A.I.
Quality Control Manual Page 1 of 4<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 0<br />
6.1.0 GENERAL<br />
SECTION 6<br />
WELDING <strong>CONTROL</strong><br />
6.1.1 This section outlines the basic elements of welding control within <strong>Industrial</strong> <strong>Piping</strong>,<br />
<strong>Inc</strong>.<br />
6.1.2 All welding performed on Code fabrication shall conform to the requirements of ASME<br />
Section IX with additional requirements of the applicable Section to which work is<br />
performed.<br />
6.2.0 WELDING PROCEDURE SPECIFICATIONS<br />
6.2.1 The Quality Control Manager has the responsibility for preparing the Welding<br />
Procedure Specifications. The essential, supplemental (if required), and non-essential<br />
variables are documented. A Welding Procedure Specification (WPS) will be revised<br />
whenever there is a change in any nonessential variable. The revision will be noted on<br />
the WPS and dated. A change in any essential variable or supplementary essential<br />
variable shall require requalification to be by another Procedure Qualification Record<br />
(PQR).<br />
6.2.2 The Quality Control Manager is responsible for conducting the qualification tests for<br />
the WPS and documenting the Procedure Qualification Record. Preparation and testing<br />
of the required specimens is performed to Section IX requirements by a testing<br />
laboratory. The Laboratory Test Results are reviewed by the Quality Control Manager,<br />
and if acceptable, he records the test results on the Procedure Qualification Record<br />
which he will date and certify. The Laboratory Test Reports will be maintained on file<br />
by the Quality Control Manager.<br />
6.2.3 The Fabrication Engineer is responsible for assigning the WPS for welding of new<br />
fabrication to the ASME Code and for repair or alteration welding to the National<br />
Board Inspection Code. The applicable WPS number shall be included on the Certified<br />
Drawing. In the case of dispositioning of in-process nonconformities involving welded<br />
repairs, the Quality Control Manager shall be responsible for assigning WPS's on the<br />
Nonconformance Report. (See 4.9.1 and 5.4.2).
Quality Control Manual Page 2 of 4<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 0<br />
6.3.0 WELDER/WELDING OPERATOR QUALIFICATIONS<br />
6.3.1 The Quality Control Manager is responsible for the qualification of all<br />
welders and welding operators (welders) to an applicable Welding Procedure<br />
Specification. Qualification may be by radiography if permitted by the Code or by<br />
guided bend tests performed in-house. The Quality Control Manager shall maintain on<br />
file and certify the welder/welding operator performance qualifications (WPQ).<br />
6.3.2 Requalification of a welder/welding operator is required when he has not welded with a<br />
process during a period of 6 months or more. Requalification is required when there is<br />
reason to question a welder/welding operator's ability to make a sound weld that meets<br />
the Welding Procedure Specification to which he is certified, or when welder essential<br />
variables change.<br />
6.3.3 A record of welders'/welding operators' qualifications in various processes is<br />
maintained by the Shop/Field Quality Control Inspector. The Welders continuity<br />
record shall be updated quarterly by the Shop/Field Quality Control Inspector. The<br />
ASME Welders Qualifications (Exhibit J) shall be updated monthly by the Shop/Field<br />
Quality Control Inspector. Updated copies of the log of qualified welders will be<br />
returned to the Shop/Field Superintendent who is responsible for assignment of<br />
welders/welding operators to a particular job.<br />
6.3.4 A copy of all applicable Welding Procedure Specifications is maintained on file in the<br />
shop and at the field job site. These are available for use by all who require them.<br />
6.3.5 The Welding Procedure Specifications, Procedure Qualification Records, and Records<br />
of Welder/Welding Operator Performance Qualification are made available to the<br />
Authorized Inspector for his review. The Authorized Inspector shall have the right to<br />
require re-qualifications of the Welder and/or WPS for cause.<br />
6.4.0 WELD FILLER MATERIAL <strong>CONTROL</strong><br />
6.4.1 The Quality Control Manager is responsible for instructing the Purchasing Agents<br />
regarding the welding filler materials to be purchased. All Code weld filler materials<br />
shall be ordered to the proper SFA/AWS specification number.
Quality Control Manual Page 3 of 4<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 0<br />
6.4.2 Weld filler material and flux is inspected by the Quality Control Manager to ensure that<br />
it is properly identified with Heat Code information, meets the requirements of the<br />
Purchase Order and applicable material specifications, and is free from damage and<br />
defects. Materials which do not comply with the Purchase Order or material<br />
specifications, are not properly identified, or are damaged or defective are considered<br />
nonconformities and shall be returned to the vendor or processed as described in<br />
Section 5, Control of Nonconformities.<br />
6.4.3 All received and accepted weld filler materials and flux are placed in a designated<br />
storage area under the control of the Shop/Field Superintendent. All flux coated<br />
electrodes requiring temperature control by the manufacturer or Code are placed in<br />
holding ovens after opening of their containers. The electrodes are segregated in the<br />
ovens relative to their size and classification. Welding electrodes of different<br />
classifications or sizes are not intermingled in the oven. The ovens are maintained at<br />
temperatures in accordance with the manufacturer’s requirements or ASME Section II<br />
Part C.<br />
6.4.4 The Shop/Field Superintendent is responsible for the issuance of low hydrogen filler<br />
materials. These electrodes are issued for the duration of the welder’s shift and are to be<br />
stored in portable rod ovens issued with the low Hydrogen electrodes.<br />
6.4.5 The welder/welding operator shall return unused materials at the end of his shift. All<br />
material is examined for identification and condition, and low Hydrogen electrodes<br />
placed in the oven. Materials that are damaged or otherwise unfit for use are not used<br />
for Code work.<br />
6.5.0 WELDER/WELDING OPERATOR IDENTIFICATION SYMBOL<br />
6.5.1 Qualified welders/welding operators shall be assigned an identification number or<br />
symbol by the Quality Control Manager. The welder/welding operator shall record his<br />
identification symbol adjacent to all welds made by him, at intervals not exceeding 3<br />
feet. For ferrous materials ¼” and over in thickness and nonferrous materials ½” and<br />
over in thickness, he shall utilize a low stress stencil or vibroetcher issued by the<br />
Quality Control Manager. For identifying welds on materials in which the thickness is<br />
less than stated above the welder/welding operator shall mark his identifying symbol by<br />
vibroetching or another marking method acceptable to the Authorized Inspector.
Quality Control Manual Page 4 of 4<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 0<br />
6.5.2 In lieu of stamping, stenciling, or vibroetching a welder/welding operator's identifying<br />
symbol onto the hardware, <strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. may elect to maintain a record of<br />
personnel utilized on each joint. This record shall be made available to and found<br />
acceptable by the Authorized Inspector.<br />
6.5.3 When a welder/welding operator leaves the employment of <strong>Industrial</strong> <strong>Piping</strong>,<br />
<strong>Inc</strong>. the identifying number assigned to him should not be reissued for 3 months.<br />
6.6.0 TACKWELDS<br />
6.6.1 Tackwelds used to secure alignment shall either be removed completely when they<br />
have served their purpose or their stopping and starting ends shall be properly prepared<br />
by grinding or other suitable means so that they maybe satisfactorily incorporated into<br />
the final weld.<br />
6.6.2 Tackwelds, whether removed or left in place, shall be made using a buttweld procedure<br />
qualified in accordance with Section IX. Tackwelds to be left in place shall be made by<br />
welders qualified in accordance with an IPI Welding Procedure. They shall be<br />
examined visually for defects by the QC Inspector, and if found to be defective shall be<br />
removed.<br />
6.7.0 ASSIGNMENT OF WELDERS/WELDER OPERATORS FOR WELDING<br />
6.7.1 The Shop Superintendent for shop work and the Field Superintendent for fieldwork<br />
shall be responsible for instructing, supervising, and assigning welders and welding<br />
operators for Code Welding. It is their responsibility to assure that the welders/welding<br />
operators are properly qualified and skilled to perform welding to which they are<br />
assigned.
Quality Control Manual Page 1 of 2<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 1<br />
7.1.0 GENERAL<br />
SECTION 7<br />
NONDESTRUCTIVE EXAMINATION<br />
7.1.1 The purpose of this section is to describe the methods and procedures used by <strong>Industrial</strong><br />
<strong>Piping</strong>, <strong>Inc</strong>. to accomplish Nondestructive Testing and to assure these tests are<br />
performed by qualified personnel.<br />
7.1.2 The Fabrication Engineer shall be responsible for determining the NDE required by the<br />
applicable Code Sections, which shall be performed by qualified personnel. These<br />
requirements will be provided on the Certified Drawing.<br />
7.1.3 Each NDE Examiner shall have visual acuity to enable him/her to read Jaeger J-2<br />
letters at not less than 12". Eye exam to be administered annually.<br />
7.1.4 Radiography, UT and Magnetic Particle will be conducted by a qualified subcontractor.<br />
Liquid Penetrant, and Visual Examinations shall be performed by a qualified <strong>Industrial</strong><br />
<strong>Piping</strong>, <strong>Inc</strong>. employee or by a qualified subcontractor who will be certified by IPI.<br />
7.2.0 SUBCONTRACTED NDE<br />
7.2.1 <strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>.'s subcontracted Level III Examiners are appointed in writing by<br />
the President after review and acceptance of their written procedures, practices,<br />
calibration and personnel qualification and certification records by Quality Control<br />
Manager. It shall be the responsibility of the Level III Examiner to approve all<br />
subcontracted procedures and requalification of procedures when ever the essential<br />
variables change. Personnel qualification records for examiners used shall be retained<br />
on file by the Quality Control Manager.<br />
7.2.2 Radiography shall be performed in accordance with a standard written procedure which<br />
meets the requirements of ASME Section V and the other applicable Sections of the<br />
Code. All phases of film exposure, development, and interpretation shall come under<br />
the supervision of a Level II or Level III Examiner qualified per employers' written<br />
practice under the guidelines of SNT-TC-1A latest code accepted edition. The results<br />
will be recorded on a Radiograph Inspection Report. Verification that tests have been<br />
completed and accepted is also recorded on the IPI Traveler.
Quality Control Manual Page 2 of 2<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 1<br />
7.3.0 LIQUID PENETRANT, MAGNETIC PARTICLE, AND VISUAL EXAMINATIONS<br />
7.3.1 Examiners in Liquid Penetrant, and Visual Examinations shall be certified as competent<br />
in performing examinations and interpreting results by IPI. Qualification shall be<br />
accomplished as described in IPI's written practice, which meets the requirements of the<br />
ASME Code. This will be the responsibility of the QC Manager.<br />
7.3.2 Liquid Penetrant, and Visual Exams, when required, shall be performed in accordance<br />
with a standard written procedure which meets the requirements of ASME Section V<br />
and the other applicable Sections of the Code. Verification that the tests have been<br />
completed and accepted is made on the IPI Traveler. This will be the responsibility of<br />
the QC Manager.<br />
7.4.0 AUTHORIZED INSPECTORS' INVOLVEMENT<br />
7.4.1 Results of all Nondestructive Examinations (including film and interpretations for<br />
Radiography) shall be available to the Authorized Inspector for his review and<br />
concurrence.<br />
7.4.2 The Authorized Inspector has the prerogative of requiring requalification of NDE<br />
procedures and examiners if he has reason to doubt effectiveness of results.<br />
7.4.3 Nondestructive Examination procedures shall be demonstrated capable of producing<br />
meaningful results to the satisfaction of the Authorized Inspector, and all NDE<br />
procedures shall be certified by Quality Control Manager or Level III Examiner.
Quality Control Manual Page 1 of 1<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 0<br />
8.1.0 GENERAL<br />
SECTION 8<br />
HEAT TREATMENT<br />
(PWHT)<br />
8.1.1 The heat treatment as described in this section shall be adhered to for all shop and field<br />
Code work including all Code repair work.<br />
8.2.0 PROCEDURE<br />
8.2.1 Heat treatment, when required by the Code will be done in accordance with a written<br />
procedure. This written procedure will be approved by the Fabrication Engineer with<br />
the acceptance of the Quality Control Manager and shall be in compliance with the<br />
Code. As a minimum, this procedure will specify heating and cooling rates, time and<br />
temperature, thermocouple method of attachment, location, record, and equipment<br />
calibration requirements.<br />
8.2.2 The QC Mgr will oversee all PWHT operations both internally and externally. This<br />
includes but is not limited to the equipment and controls, procedures and calibration<br />
records.<br />
8.2.3 Records of heat treatment such as strip or dial charts shall reference the <strong>Industrial</strong><br />
<strong>Piping</strong>, <strong>Inc</strong>. Purchase Order, and job order numbers. The job record and/or charts shall<br />
be signed and dated by the operator or other supervision personnel. The<br />
time/temperature charts and any other applicable records will be reviewed, approved<br />
and retained by the Quality Control Manager and made available to the Authorized<br />
Inspector for his review.<br />
8.2.4 A metal identification tag will be attached to the item to be heat treated to identify<br />
materials and parts sent to the subcontractor's facilities. The Quality Control Manager<br />
shall perform a receiving inspection of the heat treated item upon receipt of the item<br />
from the subcontractor.<br />
8.2.5 Any tests required by an applicable Code Section, shall be performed either by<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>., or the subcontractor. Where performed by the subcontractor, the<br />
requirements shall be specified in the written procedure.
Quality Control Manual Page 1 of 1<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 0<br />
9.1.0 GENERAL<br />
SECTION 9<br />
CALIBRATION<br />
9.1.1 This section establishes the measures used to assure that gages and instruments used for<br />
quality acceptance inspections are properly controlled, calibrated and adjusted (see IPI<br />
procedure IPI-ES-14).<br />
9.1.2 The Quality Control Manager is responsible for the control of the calibration of<br />
measuring and test equipment.<br />
9.2.0 PRESSURE GAGES<br />
9.2.1 Each Pressure Gage shall be identified with a unique serial number. All records and<br />
certifications shall reference this serial number.<br />
9.2.2 Master Pressure Gages shall be calibrated against a standard dead-weight tester or<br />
master gage, every 12 months or whenever an error is suspected in accordance with a<br />
written procedure maintained by the Quality Control Manager. <strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>.<br />
contracts the services of an independent instrument company for calibration of master<br />
gages. The calibration results shall be reviewed and accepted prior to being listed in<br />
the Calibration Log for Pressure Gages (Exhibit L) by the Quality Control Manager.<br />
Pressure gauges shall be checked against the master gauge prior to each use.<br />
9.3.0 MEASURING INSTRUMENT<br />
9.3.1 Each Measuring Instrument (micrometer, dial caliper and ultrasonic thickness tester)<br />
shall be marked with a unique serial number. All records and certifications shall<br />
reference this serial number.<br />
9.3.2 Before use, the above mentioned measuring instruments shall be checked with standard<br />
gage blocks and pins. Gage blocks and pins shall be calibrated (see IPI Procedure IPI-<br />
ES-14).<br />
9.3.3 A defective Measuring Instrument or one which cannot be properly calibrated shall be<br />
removed from usage. If not repairable, the serial number shall not be reused on another<br />
Measuring Instrument.<br />
9.3.4 Items inspected with defective measuring instruments will be handled by Section 5.
Quality Control Manual Page 1 of 1<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 0<br />
10.1.0 GENERAL<br />
SECTION 10<br />
RECORDS RETENTION<br />
10.1.1 Records shall be maintained to demonstrate conformance to specified requirements and<br />
effective implementation of the ASME Code and this manual.<br />
10.2.0 RECORDS DISTRIBUTION AND RETENTION<br />
10.2.1 <strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. will maintain manufacturers’ data reports and partial data reports<br />
on file for 5 years. RT film for Section I work shall be maintained on file for 5 years.<br />
This will be the responsibility of the QC Manager.<br />
10.2.2 After the Authorized Inspector has made his final inspection, he will be presented with<br />
a completed Manufacturers' Data Report certified by the Quality Control Manager. Any<br />
records he may require will also be presented. When he is satisfied that all Code<br />
requirements have been met, he may sign and date the Manufacturer's Data Report.<br />
10.2.3 The Manufacturer's Data Reports for the boiler or pressure vessel shall be distributed to:<br />
the user or designated agent, the Authorized Inspector upon request, Jurisdictional<br />
Authorities, and the original to the National Board. Distribution is the responsibility of<br />
the Quality Control Manager.<br />
The Manufacturer or Assembler shall maintain the documents outlined below for a<br />
period of at least 3 years;<br />
(1) Manufacturer’s Partial Data Reports<br />
(2) Certified drawings<br />
(3) Design calculations<br />
(4) Material Test Reports and/or material certifications<br />
(5) Welding Procedure Specifications and Procedure Qualification Records<br />
(6) Welders Qualification Records<br />
(7) RT and UT reports<br />
(8) IPI Travelers<br />
(9) Postweld heat treatment records<br />
(10) Nonconformances and dispositions<br />
(11) Hydrostatic test records
Quality Control Manual Page 1 of 4<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 0<br />
11.1.0 GENERAL<br />
SECTION 11<br />
REPAIRS AND ALTERATIONS<br />
11.1.1 Shop or field repairs and alterations to pressure retaining items (PRI) are made in<br />
accordance with the applicable requirements of the National Board Inspection Code<br />
(NBIC), ASME Code, Jurisdictional/Requirements and this Quality Control Manual.<br />
11.2.0 DEFINITIONS<br />
11.2.1 Repair - defined as the work necessary to restore a pressure retaining item (PRI) to a<br />
safe and satisfactory operating condition.<br />
11.2.1(a) Routing Repairs – Routine Repairs are limited to those listed in NBIC. Routine<br />
Repairs shall be controlled as required in this Quality Manual, except the CI may waive<br />
in process inspections and stamping. Routine Repairs shall be documented on the R-1<br />
form with “Routine Repair” in the Remarks section.<br />
11.2.2 Alteration - any change in the item described on the original Manufacturer’s Data<br />
Report that affects the pressure containing capability of the PRI. Nonphysical changes<br />
such as an increase in the maximum allowable working pressure (internal or external)<br />
or design temperature of a boiler or pressure vessel shall be considered an alteration. A<br />
change in minimum temperature shall also be considered an alteration.<br />
11.2.3 National Board Commissioned Inspector (CI) - An individual who holds a valid and<br />
current National Board Commission. The AI can perform any functions that the CI can<br />
perform.<br />
11.2.4 Jurisdiction - A Governmental entity which administers and enforces one or more<br />
sections of the ASME Code.<br />
11.2.5 Pressure Retaining Item (PRI) - Any boiler, pressure vessel, piping or material used for<br />
the containment of pressure, either internal or external. The pressure may be obtained<br />
from an external source or by the application of heat from a direct source, or any<br />
combination thereof.
Quality Control Manual Page 2 of 4<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 0<br />
11.3.0 RESPONSIBILITY<br />
11.3.1 The Quality Control Manager is responsible for compliance with the Quality<br />
Control Manual for shop and field repairs and alterations to Code items.<br />
11.4.0 PROCEDURES<br />
11.4.1 Inspection and certification of repairs and alterations shall be made by a<br />
Commissioned Inspector (CI).<br />
11.4.2 The Quality Control Manager, prior to the start of work, provides the CI with<br />
drawings, calculations, procedures, IPI Travelers, copy of the original<br />
Manufacturer's Data Report for the item, and any other documents necessary for the<br />
CI to accept the method of repair or alteration, and to designate his required<br />
inspection points.<br />
11.4.3 The Quality Control Manager, if requested by the CI, arranges for his access to<br />
make such inspections of the PRI he deems necessary in order to accept the method<br />
of repair or alteration.<br />
11.4.4 The Quality Control Manager or Field Quality Control Inspector keeps the CI<br />
informed of the progress and completion of the work so he may make his<br />
designated inspections, and accept the repair or alteration after his final inspection<br />
of the completed work.<br />
11.4.5 All NDE and PWHT required by the Code for the original construction of the PRI<br />
are required for the repair or alteration, except when not possible or practical,<br />
alternative methods may be used provided concurrence with the CI and Jurisdiction<br />
(if required) is obtained. The final pressure test shall be as required in Part 3 of the<br />
NBIC for repairs and for alterations.<br />
11.5.0 RECORDS<br />
11.5.1 The repair or alteration is to be documented on the current R-1 Report of Repair or<br />
R-2 Report of Alteration as applicable.<br />
The Form R-4 Report Supplementary Sheet shall be used for additional information<br />
not included on the forms R-1 or R-2.
Quality Control Manual Page 3 of 4<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 0<br />
11.5.2 When the work is complete, the applicable NBIC Form is prepared and certified in<br />
ink by the Quality Control Manager, and distributed as described in 11.7.0 below.<br />
11.5.3 The final records, together with the completed NBIC Forms and attachments are<br />
presented to the CI for his review. When he has satisfied himself that all NBIC,<br />
Jurisdiction, Code and Manual requirements have been met, he may authorize<br />
application of the "R" Symbol to the appropriate nameplate stamping and then<br />
certify the applicable NBIC Forms. All records referenced in this section are<br />
available for review by the CI.<br />
11.6.0 STAMPING<br />
11.6.1 If, during the repair or alteration of a pressure retaining item, it is necessary to<br />
remove the original Manufacturer's ASME Code Stamping or nameplate; the CI<br />
will, subject to the approval of the Jurisdiction:<br />
(a) Witness the making of a facsimile or rubbing of the old and new stamping;<br />
(b) Witness obliteration or removal of the old stamping, and transfer of the<br />
stamping to the new part or location on the item, less the original Code<br />
Symbol. The Code Symbol is NOT restamped.<br />
11.6.2 When the stamping is on a nameplate, the CI witnesses the transfer of the<br />
nameplate to its new location.<br />
11.6.3 The stamping or attachment of a National Board nameplate (Exhibit K) shall be<br />
adjacent to the original Manufacturer's stamping or nameplate. The stamping or<br />
nameplate shall comply with the NBIC. In the event a PRI is repaired repetitively<br />
by IPI, the original repair tag can be stamped with the new date of repair in lieu of<br />
adding an additional tag.
Quality Control Manual Page 4 of 4<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 0<br />
11.6.4 The Quality Control Manager retains custody and control of the "R" stamp. This<br />
symbol stamp is the property of the National Board.<br />
11.7.0 DISTRIBUTION OF NBIC FORMS<br />
11.7.1 One copy of Form R-1, Report of Repair, with attachments, is filed with the<br />
owner/user and when required by the AIA responsible for inservice inspection and<br />
jurisdiction at the location of installation and CI.<br />
11.7.2 One copy of Form R-2, Report of Alteration, with attachments, is provided to the<br />
CI, the owner/user, the Jurisdiction and AIA responsible for inservice inspection<br />
when required. A copy is retained in the job file.<br />
11.7.3 R-1 and R-2 for non registered PRI may be registered with The National Board. R-<br />
2 for registered PRI shall be registered with the National Board.<br />
11.7.4 The QC Manager shall maintain a single, sequential log of all Forms R-1 and R-2<br />
registered with the National Board. Those reports not registered with the National<br />
Board shall be retained for a minimum of 5 years.<br />
11.7.5 The CI’s authorization to perform a repair or alteration shall be obtained and<br />
documented on the IPI Traveler, prior to initiation of a repair or alteration to a PRI.<br />
The CI making the acceptance inspection should be same CI who authorized the<br />
repair or alteration, but, in all cases, shall be an employee of the same organization<br />
as that of the Inspector that authorized the repair or alteration.
Quality Control Manual Page 1 of 2<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 0<br />
12.1.0 GENERAL<br />
SECTION 12<br />
THE AUTHORIZED INSPECTOR<br />
12.1.1 The purpose of this section is to define <strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>.'s involvement with<br />
the Authorized Inspector.<br />
12.2.0 DEFINITION<br />
12.2.1 Authorized Inspector - An individual, designated as such by an ASME and National<br />
Board accredited Authorized Inspection Agency, who holds a valid Certificate of<br />
Competency and National Board Commission with an "A" endorsement, and is<br />
employed by the Authorized Inspection Agency with whom IPI has a valid<br />
inspection agreement. <strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. does not use a secondary ASME<br />
Accredited Authorized Inspection Agency (A.I.A.). If in the future a secondary AIA<br />
is required this section shall be revised.<br />
12.3.0 INVOLVEMENT WITH THE AUTHORIZED INSPECTOR<br />
12.3.1 The Quality Control Manager will be the primary point of contact for the<br />
Authorized Inspector. He is responsible for assuring notification of the Authorized<br />
Inspector in all cases where his direct involvement has been specified.<br />
12.3.2 The Authorized Inspector shall be granted free access to those places where work<br />
under his jurisdiction is being performed. The Authorized Inspector shall have free<br />
access to documents, records, drawings, procedures, instructions, Purchase Orders,<br />
in all plants that are concerned with the supply or manufacture of materials for the<br />
vessel, or other documents which he may request to assist his determination of<br />
product compliance to Code requirements.<br />
12.3.3 A current controlled copy of the Quality Control Manual will be made available to<br />
the Authorized Inspector at the plant or in the field.<br />
12.3.4 The Authorized Inspector will have direct involvement with those materials, partial<br />
assemblies or assemblies found to deviate from the Code requirements for any<br />
reason. This involvement shall include notifying him of the nature of the deviation<br />
and notification of <strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>.'s proposed disposition. This involvement<br />
shall be in the depth he may direct such as establishing Inspection Points, to assure<br />
him that the final disposition fulfills Code compliance.
Quality Control Manual Page 2 of 2<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 0<br />
12.3.5 The Authorized Inspector shall be consulted on repairs to any pressure retaining<br />
materials prior to the repairs being performed.<br />
12.3.6 Free access as described in Paragraph 12.3.2 shall so apply to the Authorized<br />
Inspector's Supervisor in order to perform periodic audits of <strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>.'s<br />
system and performance of the Authorized Inspector as required.
Quality Control Manual Page 1 of 1<br />
Revision 0<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>.<br />
SECTION 13<br />
EXHIBITS - TABLE OF CONTENTS<br />
EXHIBIT TITLE REV. DATE<br />
A Master Issue Log - Controlled 0 9/5/08<br />
B IPI Traveler 0 9/5/08<br />
C Requisition 0 9/5/08<br />
D Purchase Order 0 9/5/08<br />
E Receiving Inspection Report 0 9/5/08<br />
F Job Release Memo 0 9/5/08<br />
G Nonconformance Report 0 9/5/08<br />
H Hold Tag 0 9/5/08<br />
I Nonconformity Log 0 9/5/08<br />
J ASME Welders Qualifications 0 9/5/08<br />
K National Board Nameplate Facsimile 0 9/5/08<br />
L Calibration Log for Pressure Gages 0 9/5/08
Quality Control Manual Page 1 of 1<br />
Revision 0<br />
EXHIBIT A<br />
INDUSTRIAL PIPING, INC.<br />
MASTER ISSUE LOG<br />
"<strong>CONTROL</strong>LED"<br />
Serial No. Revision Assigned Date Issued
Quality Control Manual Page 1 of 2<br />
EXHIBIT B Revision 0<br />
IPI TRAVELER<br />
PRESSURE VESSEL CHECK LIST<br />
CUSTOMER CHEMICAL DESIGN, INC. JOB NO. W-2599C<br />
STAMP REQ U DWG. NO. D062599C<br />
NDE REQ<br />
RT<br />
EQUIP. REGENERATION HEATER CASE<br />
NO SEQUENCE WPS IPI DATE AI DATE<br />
01 DRAWINGS AND CALCULATIONS CHECKED<br />
02 MILL TEST REPORTS ON FILE<br />
03 MATERIAL MARKINGS TRANSFERRED<br />
04 MATERIAL RECEIPT INSPECTION<br />
05<br />
06 LAYOUT NOZZLE B ON BOTTOM HEAD<br />
07 FIT & TACK NOZZLE B IN BOTTOM HEAD<br />
08 WELD NOZZLE B IN BOTTOM HEAD<br />
09<br />
10 FIT & TACK GUSSET TO NOZZLE B & BOTTOM HEAD<br />
11 WELD GUSSET TO NOZZLE B & BOTTOM HEAD<br />
12<br />
13 LAYOUT NOZZLE A ON SHELL<br />
14 FIT & TACK NOZZLE A IN SHELL<br />
15 WELD NOZZLE A IN SHELL<br />
16<br />
17 FIT & TACK GUSSET TO NOZZLE A & SHELL<br />
18 WELD GUSSET TO NOZZLE A & SHELL<br />
19<br />
20 FIT & TACK TOP FLANGE TO SHELL<br />
21 WELD TOP FLANGE TO SHELL<br />
22<br />
23 LAYOUT LUGS & NAMEPLATE BRACKET ON SHELL<br />
24 FIT & TACK LUGS & NAMEPLATE BRACKET ON SHELL<br />
25 WELD LUGS & NAMEPLATE BRACKET ON SHELL<br />
26
Quality Control Manual Page 2 of 2<br />
EXHIBIT B Revision 0<br />
IPI TRAVELER<br />
PRESSURE VESSEL CHECK LIST<br />
27 WELDERS STAMP & QUALIFICATIONS<br />
28<br />
29 INTERNAL INSPECTION<br />
30 REVIEW RT<br />
31 DIMENSIONAL<br />
32 VISUAL & MATERIAL ID<br />
33 HYDROSTATIC TEST @ 488___ PSIG<br />
34<br />
35 CODE NAMEPLATE ATTACHED<br />
36<br />
37 QC DATA PACKAGE SIGN OFF<br />
38<br />
39<br />
40<br />
41<br />
42<br />
43<br />
44<br />
45<br />
46<br />
47<br />
IPI JOB NO___W-2599C_____________<br />
NOTES: 1. AUTHORIZED INSPECTOR’S REQUIRED INSPECTION HOLD POINT INDICATED BY MARK BESIDE<br />
SEQUENCE DESCRIPTION.<br />
INSPECTION ESTABLISHED BY: ________________________________ DATE:_______________<br />
2. QCM REVIEW OF HOLD POINTS WITH FABRICATION FOREMAN.<br />
PREPARED BY: _______ ___________________ DATE: _____________<br />
Q.C. MANAGER
Quality Control Manual Page 1 of 1<br />
EXHIBIT C Revision 0<br />
Quality Control Manual Page 1 of 1<br />
EXHIBIT D Revision 0
Quality Control Manual Page 1 of 1<br />
EXHIBIT E Revision 0<br />
RECEIVING INSPECTION REPORT
Quality Control Manual Page 1 of 1<br />
EXHIBIT F Revision 0<br />
FABRICATION DIVISION<br />
2794 Old Richburg Road<br />
Richburg, SC 29729<br />
TELEPHONE<br />
704/588-1100<br />
FAX 800/789-3537<br />
Website: www.goipi.com<br />
JOB RELEASE MEMO<br />
JOB NO.: W-2631 C&D<br />
Customer: Wittemann Date: September 25, 2006<br />
Location: Taiwan Scope: (2) 12” Code Vessels<br />
Customer Contact: John Day Estimated Man-Hours: T & M<br />
Scope:<br />
Fabricate (2) pressure vessels per ASME Code Section VIII, Division I 2004 Edition A05<br />
Addenda. Fabricate per the attached drawings.<br />
Schedule Required:<br />
All fabrication to be complete no later than October 31, 2006.<br />
Materials:<br />
Material for the vessels has been ordered and the majority is here now. Use only materials which<br />
have been marked for use on this job.<br />
Quality Requirements:<br />
See drawings for paint and quality requirements. NO RT is required on vessel per UW-11. All<br />
material must have Mill Test Reports with matching Heat numbers.<br />
Direct questions to Travis Ramsey<br />
File No. W-2631
Quality Control Manual Page 1 of 1<br />
EXHIBIT H Revision 0<br />
HOLD TAG<br />
RED
Quality Control Manual Page 1 of 1<br />
EXHIBIT I Revision 0<br />
NONCONFORMITY LOG<br />
NCR<br />
NO<br />
DESCRIPTION<br />
DATE<br />
DISCOVERED<br />
DATE<br />
CLOSED
Quality Control Manual Page 1 of 1<br />
EXHIBIT J Revision 0<br />
Bold X – Qualfied by Testing.<br />
X indicates qualification by QW-423 QW-433 allowance<br />
E indicates continuity Expired.
Quality Control Manual Page 1 of 1<br />
EXHIBIT K Revision 0<br />
NATIONAL BOARD NAMEPLATE FACSIMILE
Quality Control Manual<br />
EXHIBIT L Revision 0<br />
Calibration Log for Pressure Gages<br />
SERIAL<br />
NUMBER<br />
DESCRIPTION<br />
RANGE<br />
DATE<br />
CALIBRATED<br />
CALIBRATED<br />
BY<br />
CALIBRATIO<br />
N<br />
DUE DATE