Quality Control Manual Page 2 of 4<br />

<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 0<br />

11.3.0 RESPONSIBILITY<br />

11.3.1 The Quality Control Manager is responsible for compliance with the Quality<br />

Control Manual for shop and field repairs and alterations to Code items.<br />

11.4.0 PROCEDURES<br />

11.4.1 Inspection and certification of repairs and alterations shall be made by a<br />

Commissioned Inspector (CI).<br />

11.4.2 The Quality Control Manager, prior to the start of work, provides the CI with<br />

drawings, calculations, procedures, IPI Travelers, copy of the original<br />

Manufacturer's Data Report for the item, and any other documents necessary for the<br />

CI to accept the method of repair or alteration, and to designate his required<br />

inspection points.<br />

11.4.3 The Quality Control Manager, if requested by the CI, arranges for his access to<br />

make such inspections of the PRI he deems necessary in order to accept the method<br />

of repair or alteration.<br />

11.4.4 The Quality Control Manager or Field Quality Control Inspector keeps the CI<br />

informed of the progress and completion of the work so he may make his<br />

designated inspections, and accept the repair or alteration after his final inspection<br />

of the completed work.<br />

11.4.5 All NDE and PWHT required by the Code for the original construction of the PRI<br />

are required for the repair or alteration, except when not possible or practical,<br />

alternative methods may be used provided concurrence with the CI and Jurisdiction<br />

(if required) is obtained. The final pressure test shall be as required in Part 3 of the<br />

NBIC for repairs and for alterations.<br />

11.5.0 RECORDS<br />

11.5.1 The repair or alteration is to be documented on the current R-1 Report of Repair or<br />

R-2 Report of Alteration as applicable.<br />

The Form R-4 Report Supplementary Sheet shall be used for additional information<br />

not included on the forms R-1 or R-2.