QUALITY CONTROL MANUAL - Industrial Piping, Inc.
QUALITY CONTROL MANUAL - Industrial Piping, Inc.
QUALITY CONTROL MANUAL - Industrial Piping, Inc.
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Quality Control Manual Page 4 of 4<br />
<strong>Industrial</strong> <strong>Piping</strong>, <strong>Inc</strong>. Revision 0<br />
11.6.4 The Quality Control Manager retains custody and control of the "R" stamp. This<br />
symbol stamp is the property of the National Board.<br />
11.7.0 DISTRIBUTION OF NBIC FORMS<br />
11.7.1 One copy of Form R-1, Report of Repair, with attachments, is filed with the<br />
owner/user and when required by the AIA responsible for inservice inspection and<br />
jurisdiction at the location of installation and CI.<br />
11.7.2 One copy of Form R-2, Report of Alteration, with attachments, is provided to the<br />
CI, the owner/user, the Jurisdiction and AIA responsible for inservice inspection<br />
when required. A copy is retained in the job file.<br />
11.7.3 R-1 and R-2 for non registered PRI may be registered with The National Board. R-<br />
2 for registered PRI shall be registered with the National Board.<br />
11.7.4 The QC Manager shall maintain a single, sequential log of all Forms R-1 and R-2<br />
registered with the National Board. Those reports not registered with the National<br />
Board shall be retained for a minimum of 5 years.<br />
11.7.5 The CI’s authorization to perform a repair or alteration shall be obtained and<br />
documented on the IPI Traveler, prior to initiation of a repair or alteration to a PRI.<br />
The CI making the acceptance inspection should be same CI who authorized the<br />
repair or alteration, but, in all cases, shall be an employee of the same organization<br />
as that of the Inspector that authorized the repair or alteration.