- Page 1 and 2:
Fundamentals of Emergency Preparedn
- Page 3 and 4:
Meet your presenter… • NRC - 20
- Page 5 and 6:
Role of the NRC in the Federal Gove
- Page 7 and 8:
Departments • Heads of executive
- Page 9 and 10:
Independent Agencies • “Indepen
- Page 11 and 12:
The Commission • NRC headed by fi
- Page 13 and 14:
Introduction and History of Emergen
- Page 15 and 16:
What is Emergency Preparedness? •
- Page 17 and 18:
Regulations • What are adequate m
- Page 19 and 20:
Why prepare? • Prudent - Prepare
- Page 21 and 22:
Pre-TMI History of EP Requirements
- Page 23 and 24:
History of EP Requirements Pre-TMI
- Page 25 and 26:
History of EP Requirements Pre-TMI
- Page 28 and 29:
History of EP Requirements - TMI
- Page 30 and 31:
History of EP Requirements • 1982
- Page 32 and 33:
History of EP Requirements Seabrook
- Page 34 and 35:
History of EP Requirements • 1992
- Page 36 and 37:
History of EP Requirements • 2004
- Page 38 and 39:
BREAK
- Page 40 and 41:
Topics: • Defense-in-Depth • Pr
- Page 42 and 43:
Planning Philosophy • Planning re
- Page 44 and 45:
EPA-400 • “Manual of Protective
- Page 46 and 47:
PAGs • Established by the EPA and
- Page 48 and 49:
Plume Exposure Pathway EPZ • Area
- Page 51 and 52:
Duane Arnold Energy Center Cedar Ra
- Page 54:
Prompt Public Notification • Aler
- Page 57 and 58:
Brief History of EPZs • 1970s - D
- Page 59 and 60:
Relationship between PAGs and EPZs
- Page 61 and 62:
Technical Support Center (TSC) - Re
- Page 63 and 64:
Emergency Operations Facility (EOF)
- Page 65 and 66:
Offsite EP • Joint Information Ce
- Page 67 and 68:
Emergency Classifications • Unusu
- Page 69 and 70:
Site Area Emergency Definition •
- Page 71 and 72:
Emergency Classifications • No re
- Page 73 and 74:
Initiating Conditions • Predeterm
- Page 75 and 76: NEXT EP Regulations and Guidance EP
- Page 77 and 78: EP Regulations and Guidance EP Insp
- Page 79 and 80: EP Regulations and Guidance • 10
- Page 81 and 82: 10 CFR 50.54(q) • §50.54, Condit
- Page 83 and 84: 10 CFR 50.47(b)(1) Primary responsi
- Page 85 and 86: 10 CFR 50.47(b)(3) Arrangements for
- Page 87 and 88: 10 CFR 50.47(b)(5) Procedures have
- Page 89 and 90: 10 CFR 50.47(b)(7) Information is m
- Page 91 and 92: 10 CFR 50.47(b)(9) Adequate methods
- Page 93 and 94: 10 CFR 50.47(b)(11) Means for contr
- Page 95 and 96: 10 CFR 50.47(b)(13) General plans f
- Page 97 and 98: 10 CFR 50.47(b)(15) Radiological em
- Page 99 and 100: 10 CFR 50.54(t) • Periodic review
- Page 101 and 102: NUREG-0654/FEMA-REP-1 • “Criter
- Page 103 and 104: NUREG-0654/FEMA-REP-1 • Appendix
- Page 105 and 106: Alternate EAL Schemes • Products
- Page 107 and 108: EP Inspection Program and Enforceme
- Page 109 and 110: Regulatory Framework NRC Overall Sa
- Page 111 and 112: Finding Colors / Significance Level
- Page 113 and 114: Emergency Preparedness Performance
- Page 115 and 116: DEP PI Example 115
- Page 117 and 118: ERO PI Example 117
- Page 119 and 120: ANS PI Example 119
- Page 121 and 122: Significance Determination Process
- Page 123 and 124: Risk Significant Planning Standards
- Page 125: BREAK
- Page 129 and 130: FEMA/DHS Time Line • 1978 - Creat
- Page 131 and 132: FEMA/DHS Time Line (continued) •
- Page 133 and 134: Reasonable Assurance • Following
- Page 135 and 136: Offsite Emergency Preparedness •
- Page 137 and 138: Reasonable Assurance • Emergency
- Page 139 and 140: Exercises • Primary means used by
- Page 141 and 142: FEMA Deficiencies • Handling of E
- Page 143 and 144: Withdrawal of Reasonable Assurance
- Page 145 and 146: Realism Rule • What happens if a
- Page 147 and 148: Seabrook Siren Trucks 147
- Page 149 and 150: The NRC/FEMA Interface • Memorand
- Page 151 and 152: MOU for Radiological Emergency Plan
- Page 153 and 154: FEMA/NRC Steering Committee - Addre
- Page 155 and 156: Regional Assistance Committee (RAC)
- Page 157 and 158: NRC/FEMA Relationship • Hurricane
- Page 159 and 160: Research and Test Reactor (RTR) EP
- Page 161 and 162: Fuel Cycle Facility EP • NUREG-11
- Page 163 and 164: EP Going Forward
- Page 165 and 166: EP Rulemaking: The Future of EP •
- Page 167 and 168: Revision to NUREG-0654/FEMA-REP-1 -
- Page 169 and 170: Performance Based EP - Commission D
- Page 171 and 172: Outreach • EP - the link between
- Page 173 and 174: Contact Information Robert Kahler O