- Page 1 and 2: Fundamentals of Emergency Preparedn
- Page 3 and 4: Meet your presenter… • NRC - 20
- Page 5 and 6: Role of the NRC in the Federal Gove
- Page 7 and 8: Departments • Heads of executive
- Page 9 and 10: Independent Agencies • “Indepen
- Page 11 and 12: The Commission • NRC headed by fi
- Page 13 and 14: Introduction and History of Emergen
- Page 15 and 16: What is Emergency Preparedness? •
- Page 17 and 18: Regulations • What are adequate m
- Page 19 and 20: Why prepare? • Prudent - Prepare
- Page 21 and 22: Pre-TMI History of EP Requirements
- Page 23: History of EP Requirements Pre-TMI
- Page 28 and 29: History of EP Requirements - TMI
- Page 30 and 31: History of EP Requirements • 1982
- Page 32 and 33: History of EP Requirements Seabrook
- Page 34 and 35: History of EP Requirements • 1992
- Page 36 and 37: History of EP Requirements • 2004
- Page 38 and 39: BREAK
- Page 40 and 41: Topics: • Defense-in-Depth • Pr
- Page 42 and 43: Planning Philosophy • Planning re
- Page 44 and 45: EPA-400 • “Manual of Protective
- Page 46 and 47: PAGs • Established by the EPA and
- Page 48 and 49: Plume Exposure Pathway EPZ • Area
- Page 51 and 52: Duane Arnold Energy Center Cedar Ra
- Page 54: Prompt Public Notification • Aler
- Page 57 and 58: Brief History of EPZs • 1970s - D
- Page 59 and 60: Relationship between PAGs and EPZs
- Page 61 and 62: Technical Support Center (TSC) - Re
- Page 63 and 64: Emergency Operations Facility (EOF)
- Page 65 and 66: Offsite EP • Joint Information Ce
- Page 67 and 68: Emergency Classifications • Unusu
- Page 69 and 70: Site Area Emergency Definition •
- Page 71 and 72: Emergency Classifications • No re
- Page 73 and 74: Initiating Conditions • Predeterm
- Page 75 and 76:
NEXT EP Regulations and Guidance EP
- Page 77 and 78:
EP Regulations and Guidance EP Insp
- Page 79 and 80:
EP Regulations and Guidance • 10
- Page 81 and 82:
10 CFR 50.54(q) • §50.54, Condit
- Page 83 and 84:
10 CFR 50.47(b)(1) Primary responsi
- Page 85 and 86:
10 CFR 50.47(b)(3) Arrangements for
- Page 87 and 88:
10 CFR 50.47(b)(5) Procedures have
- Page 89 and 90:
10 CFR 50.47(b)(7) Information is m
- Page 91 and 92:
10 CFR 50.47(b)(9) Adequate methods
- Page 93 and 94:
10 CFR 50.47(b)(11) Means for contr
- Page 95 and 96:
10 CFR 50.47(b)(13) General plans f
- Page 97 and 98:
10 CFR 50.47(b)(15) Radiological em
- Page 99 and 100:
10 CFR 50.54(t) • Periodic review
- Page 101 and 102:
NUREG-0654/FEMA-REP-1 • “Criter
- Page 103 and 104:
NUREG-0654/FEMA-REP-1 • Appendix
- Page 105 and 106:
Alternate EAL Schemes • Products
- Page 107 and 108:
EP Inspection Program and Enforceme
- Page 109 and 110:
Regulatory Framework NRC Overall Sa
- Page 111 and 112:
Finding Colors / Significance Level
- Page 113 and 114:
Emergency Preparedness Performance
- Page 115 and 116:
DEP PI Example 115
- Page 117 and 118:
ERO PI Example 117
- Page 119 and 120:
ANS PI Example 119
- Page 121 and 122:
Significance Determination Process
- Page 123 and 124:
Risk Significant Planning Standards
- Page 125 and 126:
BREAK
- Page 127 and 128:
Topics: • Role of FEMA • Backgr
- Page 129 and 130:
FEMA/DHS Time Line • 1978 - Creat
- Page 131 and 132:
FEMA/DHS Time Line (continued) •
- Page 133 and 134:
Reasonable Assurance • Following
- Page 135 and 136:
Offsite Emergency Preparedness •
- Page 137 and 138:
Reasonable Assurance • Emergency
- Page 139 and 140:
Exercises • Primary means used by
- Page 141 and 142:
FEMA Deficiencies • Handling of E
- Page 143 and 144:
Withdrawal of Reasonable Assurance
- Page 145 and 146:
Realism Rule • What happens if a
- Page 147 and 148:
Seabrook Siren Trucks 147
- Page 149 and 150:
The NRC/FEMA Interface • Memorand
- Page 151 and 152:
MOU for Radiological Emergency Plan
- Page 153 and 154:
FEMA/NRC Steering Committee - Addre
- Page 155 and 156:
Regional Assistance Committee (RAC)
- Page 157 and 158:
NRC/FEMA Relationship • Hurricane
- Page 159 and 160:
Research and Test Reactor (RTR) EP
- Page 161 and 162:
Fuel Cycle Facility EP • NUREG-11
- Page 163 and 164:
EP Going Forward
- Page 165 and 166:
EP Rulemaking: The Future of EP •
- Page 167 and 168:
Revision to NUREG-0654/FEMA-REP-1 -
- Page 169 and 170:
Performance Based EP - Commission D
- Page 171 and 172:
Outreach • EP - the link between
- Page 173 and 174:
Contact Information Robert Kahler O