Reason: To ensure surface water from the site is not deposited on the public highway<br />

causing danger to highway users.<br />

12<br />

The development permitted by this planning permission shall be carried out in accordance<br />

with the approved Flood Risk Assessment (FRA) <strong>and</strong> the following mitigation measures<br />

detailed within the FRA:<br />

1. Utilising SuDS measures to manage surface water, including soakaways <strong>and</strong><br />

permeable paving.<br />

2. Locating the buildings within Flood Zone 1 as to keep the development safe<br />

from flooding <strong>and</strong> not increase flood risk to others.<br />

3. Provision of an emergency egress route from the site direct to Quaker Lane as<br />

described in paragraphs 1.6, 1.7 <strong>and</strong> 1.8.<br />

The mitigation measures shall be fully implemented prior to occupation <strong>and</strong> subsequently in<br />

accordance with the timing / phasing arrangements embodied within the scheme, or within<br />

any other period as may subsequently be agreed, in writing, by the local planning authority.<br />

Reason: To prevent flooding <strong>and</strong> an increase of flood risk elsewhere <strong>and</strong> to provide a safe<br />

means of egress from the proposed development.<br />

13<br />

The development hereby approved shall be carried out in strict accordance with the<br />

mitigation <strong>and</strong> compensation measures <strong>and</strong> further survey recommendations as detailed<br />

within Section 6 of the submitted Ecological Walk-over Survey prepared by EMEC Ecology<br />

(dated April 2012).<br />

Reason: To protect the ecological interests of the site in accordance with Core Strategy Core<br />

Policy 12 Biodiversity <strong>and</strong> Green Infrastructure<br />

14<br />

Prior to commencement of development a scheme shall be submitted to <strong>and</strong> approved by<br />

the Local <strong>Planning</strong> Authority. The scheme shall identify details associated with the location,<br />

size, appearance, <strong>and</strong> functionality of the electronic gates, the proposed associated signage<br />

<strong>and</strong> details of their implementation. The approved scheme shall be implemented prior to<br />

the construction of the 2.no dwellings in order to ensure that the same safeguards are in<br />

place throughout the construction period as well as ‘post development’<br />

Reason: To protect the visual amenity of the area <strong>and</strong> to ensure that pedestrians <strong>and</strong><br />

vehicles can safely utilise the public footpath.<br />