Reason: To ensure surface water from the site is not deposited on the public highway<br />
causing danger to highway users.<br />
12<br />
The development permitted by this planning permission shall be carried out in accordance<br />
with the approved Flood Risk Assessment (FRA) <strong>and</strong> the following mitigation measures<br />
detailed within the FRA:<br />
1. Utilising SuDS measures to manage surface water, including soakaways <strong>and</strong><br />
permeable paving.<br />
2. Locating the buildings within Flood Zone 1 as to keep the development safe<br />
from flooding <strong>and</strong> not increase flood risk to others.<br />
3. Provision of an emergency egress route from the site direct to Quaker Lane as<br />
described in paragraphs 1.6, 1.7 <strong>and</strong> 1.8.<br />
The mitigation measures shall be fully implemented prior to occupation <strong>and</strong> subsequently in<br />
accordance with the timing / phasing arrangements embodied within the scheme, or within<br />
any other period as may subsequently be agreed, in writing, by the local planning authority.<br />
Reason: To prevent flooding <strong>and</strong> an increase of flood risk elsewhere <strong>and</strong> to provide a safe<br />
means of egress from the proposed development.<br />
13<br />
The development hereby approved shall be carried out in strict accordance with the<br />
mitigation <strong>and</strong> compensation measures <strong>and</strong> further survey recommendations as detailed<br />
within Section 6 of the submitted Ecological Walk-over Survey prepared by EMEC Ecology<br />
(dated April 2012).<br />
Reason: To protect the ecological interests of the site in accordance with Core Strategy Core<br />
Policy 12 Biodiversity <strong>and</strong> Green Infrastructure<br />
14<br />
Prior to commencement of development a scheme shall be submitted to <strong>and</strong> approved by<br />
the Local <strong>Planning</strong> Authority. The scheme shall identify details associated with the location,<br />
size, appearance, <strong>and</strong> functionality of the electronic gates, the proposed associated signage<br />
<strong>and</strong> details of their implementation. The approved scheme shall be implemented prior to<br />
the construction of the 2.no dwellings in order to ensure that the same safeguards are in<br />
place throughout the construction period as well as ‘post development’<br />
Reason: To protect the visual amenity of the area <strong>and</strong> to ensure that pedestrians <strong>and</strong><br />
vehicles can safely utilise the public footpath.<br />
29