16.05.2015 Views

E&R - eLocoS

E&R - eLocoS

E&R - eLocoS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

22 6/22/2011 N/BTMT 24552/24551 BIA<br />

BIA shed report: BA voltage in 24552, 24 V and hence both<br />

While starting LP exp DJ closing but STC not picking up. LP tried loco DJ not closing from 24552. But from loco no 24551 DJ<br />

SECR to rectify by keeping HBA off, but trouble not rectified.R/loco closing but not closing in 24552. Loco BA discharge in yard.<br />

demanded. So loco marked TR.<br />

Battery charger working checked found normal. Battery Make‐<br />

EXIDE<br />

M/staff attended but could not rectify and advised LP that loco<br />

23 6/22/2011 N/KRPH 27055 MGS ECR<br />

O/G‐ LP reported that while taken over charge of LE. poor brake has to go to pit to attend, brake power adjusted in pit and<br />

power.<br />

given fit. LP reported TLC at 23.30 hrs that no information by<br />

I/C LP.<br />

24 6/27/2011 12860 22504 SRC SER<br />

LP informed that QOP‐II permanently dropped so block‐II AT Igatpuri M/staff found J‐2 drum contact badly flashed.and<br />

isolated and worked the train up to DGG. At DGG another loco TM‐4,5 & 6 badly flashed.SRC shed report: TM‐4 & TM‐5<br />

27934(VSKP) attached on top.<br />

commutator brush box flashed so Both TMs changed.<br />

25 6/30/2011 12860 22586 SRC SER<br />

1 11/6/2011 12253 22372 HWH ER<br />

1 04.06.11 12833<br />

AD‐HWH<br />

2 14.06.11 2962<br />

IND‐BCT<br />

3 15.06.11 12953<br />

BCT‐NZM<br />

LP reported that TLTE between JMG‐KRL, checked Q‐51, Q‐52,<br />

GR pressure found normal then try with EEC but unsuccess.<br />

CLI/ RIG‐ N Sahoo cleaned the Q‐52 relay and gently tapped<br />

and try to take 4‐5 notches found no trouble but R/loco already<br />

attached in front so as per advice of Sr. DEE (OP) allowed that<br />

24414/BZA ( 80 kmph ) + wkg loco in dead. SRC Shed report: Q‐<br />

52 defective. same changed.<br />

Battery<br />

Bogie & its Mech.<br />

Equipments<br />

Traction Motor<br />

Relay<br />

Mal Operation by<br />

crew<br />

Bad Maintanance<br />

Shed<br />

Bad Maintanance<br />

Shed<br />

Bad Maintanance<br />

Shed<br />

Suddenly pressure dropped at YPR station due to FP pipe already Suddenly pressure dropped at YPR station due to FP pipe already<br />

SWR<br />

broken and damaged due to CRO in BZA division, found BP also cracked broken and damaged due to CRO in BZA division, found BP also Pn. Pipeline<br />

Misc<br />

from neck portion.<br />

cracked from neck portion.<br />

22601 SRC SER LP INFORMED DJ OPEN ON STANDING W/O TARGET , CHECKED FOUND MICROPROCESSOR PT WAS OPEN CIRCUITED RESULTING INTO MICROPROCESSOR SRC/SER WR<br />

SMOKE NEAR BV BOX. FRESH LOCO PROVIDED.<br />

QCVAR NOT ENERGISING & R118 OVER HEATED. LOCO SENT DEAD TO<br />

HOME SHED.<br />

22542 BRC WR AFTER PASSING SBPJ DJ TRIPPED, CHECKED FOUND X'MER OIL SPREAD SECTION CLEAR AND FRESH LOCO PROVIDED. X'MER BRC<br />

WR<br />

OUT AND OIL LEVEL MINIMUM.<br />

SHED<br />

30025 GZB NR TRAIN STOPPED AS TWO FAULT EXPEERIENCE BY LOCO PILOT F0201P1 IN RTM SHED FOUND TM 1 JAMMED.HENCE STARS (GEAR) TM END &<br />

i.e. DISTURBANCE IN CONVERTOR NO.1 AND F0201P2 i.e.EARTH FAULT GEAR CASE UNCOUPLED & SR‐1 ISOLATED BY GZB STAFF. LOCO SENT<br />

IN CONVERTOR NO.1 . AND SMOKE NOTICED FROM TM‐1.<br />

LELA WITH SR. 90 KMPH TO HOME SHED.<br />

THREE PHASE<br />

GZB<br />

NR<br />

SECR<br />

SECR<br />

SECR<br />

SECR<br />

WR<br />

4 29.06.11 GM/KWI<br />

43/3960<br />

2 03.06.11 23024+24459<br />

BL/WR(DEAD)<br />

23089 TKD WCR TRAIN STOPPED AT KM 286/20 DUE TO DJ TRIP BY QSIT WHILE BLDJ<br />

PRESSED WITH MESSAGE "INVERTER FAULTY". HBA KEPT OFF, HSIV<br />

KEPT ON "0" BUT NOT SUCCEEDED. FRESH LOCO 24528 PROVIDED.<br />

SI‐AAL, MICROPROCESSOR‐STESALIT.<br />

ET WCR LOCO WAS ORDERED EX ELS/ET. AFTER EOL LP NOT START &<br />

REPORTED QRSI‐2 DROPPING ON 4tH NOTCH HENCE LINE CLEAR<br />

CANCELLED. ELS STAFF REACHED ON LOCO & GIVEN READY AFTER<br />

INCREASING SETTING OF QRSI & TRAIN LEFT EX ET YARD. LP AGAIN<br />

REPORTED EX ET THAT QRSI‐2 DROPPING ON 800 AMP. LATER TRAIN<br />

PASSED BNI VIA LOOP LINE WITH BANKER LOCO 23817/NR BUT<br />

STOPPED NEAR ADVANCE STARTER DUE TO QRSI‐2 DROPPING HENE<br />

TRAIN BACK TO BNI LOOP LINE DUE TO GRADIENT AHEAD & LOCO<br />

FAILED & SENT TO T/S ET.<br />

AT BRC SHED JOINTLY CHECKED WITH AAL REPRESENTATIVE AND<br />

FOUND "IGDU‐VFD" RECORDED IN FAULT MEMORY OF SIV. ON<br />

FURTHER CHECKING FOUND V‐PHASE LEFT SIDE IGBT SHORT<br />

CIRCUITED. LOCO UNDER OBSERVATION AFTER IGBT CARD<br />

REPLACEMENT.<br />

SI UNIT<br />

LOCO JOINTLY CHECKED BY SLI & JE & REPORTED 01 CT (CURRENT<br />

TFP) USING AS RSI‐LM TWO CT, ONE USED IN THIS LOCO WHICH IS<br />

PARALLEL CONNECTED (ONE CT IN RSI‐2 BLOCK & ONE ADDITIONAL<br />

CT USE IN BA‐3 PANEL BETWEEN WIRE NO. A‐274 & A‐275 CAUSING<br />

QRSI‐2 DROPPING ON 800 AMPS.<br />

RESPONSIBILITY BAD WORKMANSHIP OF ELS/ET DURING<br />

UNSCHEDULE REPAIR & WRONG CONNECTION MADE TWO CT OF RSI‐<br />

2. ELS/ET REPORT‐ LOCO CHECKED AT T/S ET & FOUND QRSI‐2<br />

DROPPING ON 3rd NOTCH AT 700 AMPS CURRENT. QRSI‐2 RELAY COIL<br />

WIRE NO. A/274 & A/275 SHOWING SHORTED, EVEN AFTER BOTH<br />

SIDE CONNECTION WAS REMOVED. FURTHER DURING CHECKING<br />

FOUND 02 NOS CT IS EXISTING IN RSI‐2, WHILE IN BA‐2 & 3 02 NOS RSI<br />

CT WAS ALSO EXISTING, WHICH RESULTED TOTAL CURRENT IN QRSI<br />

RELAY INCREASED. RSI WAS LAST CHANGED ON 02.06.11.<br />

RSI MAINT WCR<br />

TKD<br />

WCR<br />

WR

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!