14.06.2015 Views

S.No. Description Data 1 Name of Project Andhera M I Tank 2 ...

S.No. Description Data 1 Name of Project Andhera M I Tank 2 ...

S.No. Description Data 1 Name of Project Andhera M I Tank 2 ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

iii) Hot Weather --<br />

33 <strong>No</strong>n-Irrigation actual (Mm 3 )<br />

i) Kharif --<br />

ii) Rabi --<br />

iii) Hot Weather --<br />

34 Seasonwise Evaporation Loss (Mm 3 )<br />

i) Kharif 0.082 Mm 3<br />

ii) Fair Weather 0.405 Mm 3<br />

iii) Total Annual<br />

0.487 Mcum<br />

35 Post Mansoon inflow(dry weather (Mm 3 )<br />

i) <strong>Project</strong> report --<br />

ii) Actual as per observation (preferred) --<br />

36 Reduction in the Reservoir due to Siltation in Mm 3<br />

i) Actual as per survey --<br />

ii) or as per formula (considering free catchment"6c")<br />

0.1118 Mm 3<br />

37 Any other commitment (2nd class<br />

irrigation,Malguzari rigths,Nastar rights etc, if any)<br />

--<br />

i) Kharif --<br />

ii) Rabi --<br />

iii) Hot Weather --<br />

38 Wather available calculation@canal head.<br />

i) water utilisation as per project report in Mm 3 1.44 Mm 3<br />

ii) deduct water utilisation for use in khrif Mm 3<br />

(31i+33i+34i+37i) 0.422 Mm 3<br />

iii) water available at the begining <strong>of</strong> Rabi (38i-38ii)<br />

Mm 3 1.018 Mm 3<br />

39 Deductions to get water available at the canal head<br />

--<br />

i) Deduct 34ii on 34iii as per utilisation porposed 0.405 Mm 3<br />

ii) Deduction for "Siltation (36i or ii) 0.1118 Mm 3<br />

iii) Deduction for fair weather non irrigation use (33ii or<br />

both 33ii+33iii) --<br />

iv) Deduction for any other commitment 37(ii +iii) --<br />

v) Water available at canal head before reservoir lift<br />

(38iii + 35ii-39(i+ii+iii+iv) 0.5012 Mm 3<br />

40 Decutions for Reservoir lift<br />

Reservoir Lift<br />

Case(A) where canal takes <strong>of</strong> directly from the<br />

reservaoir<br />

(a) Flow Lift<br />

i) Maximum Permissible Area 6% <strong>of</strong> CCA (ha) 14.46 ha.<br />

ii) Actual sanctioned area(ha)<br />

13.65 ha.<br />

iii) Maximum Allowable water allowance 3.6% <strong>of</strong> water<br />

available at canal head (Mm 3 ) i.e.39(v) 0.0180 Mm 3<br />

iv) Actual water allowance for sanctioned area<br />

=ii x 3.6 x water @canal head (39v) 0.0170 Mm 3<br />

i 100<br />

(b) Pressurised Lift (drip/sprinkler)<br />

i) Maximum Premissiable Area 14% <strong>of</strong> CCa (ha) 33.74 ha.<br />

ii) Actual sanctioned area (ha)<br />

6 ha.<br />

iii) Maximum allowable water allowance 5.65% <strong>of</strong><br />

water available at canal head (39v) (Mm 3 ) i.e.39(v)<br />

0.0283 Mm 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!