S.No. Description Data 1 Name of Project Andhera M I Tank 2 ...

S.No. Description Data 1 Name of Project Andhera M I Tank 2 ...

S.No. Description Data 1 Name of Project Andhera M I Tank 2 ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

B Case B (39v)-41(aiv+biv+civ+d+e+fiv) --<br />

43 Net water available at canal head considering canal<br />

losses (Item <strong>No</strong> 42 x 0.80 or 0.90) Mm 3 0.3834 Mm 3<br />

Net water available for UWA = 42AX conveyance<br />

efficiency OR 42BX conveyance effciency<br />

44 Prescribed unit water use entitlement per ha <strong>of</strong><br />

C.C.A<br />

Case A (43 / 27 )Mm 3 / ha.<br />

Case B (43 / 27 )Mm 3 / ha.<br />

0.001732 Mm 3 /Ha.<br />

Delta 17.32 cm<br />

NB :- 6(b) intercepted Catchment Area incluses all storages and weirs in the catchment area the project.<br />

Executive Engineer<br />

Buldana Irrigation Division<br />

Buldana<br />

Superintending Engineer<br />

Akola Irrigation Circle<br />

Akola