07.07.2015 Views

RFP Part 1 - 5

RFP Part 1 - 5

RFP Part 1 - 5

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Controls Upgrade Building 6401NBK –Bangor, Silverdale, WA.F95FYRExtended daily field overhead rate (in lieu of percentage) will be allowed for the prime contractor only.Field Office Overhead (FOH) – The FOH expenses will be distributed as noted above and will not beallowed as a direct cost to the change proposal. FOH costs cover indirect costs incurred in this projectthat are chargeable only to this contract and include costs incurred at the job site incidental to theperformance of the work, including but not limited to all costs associated with: overhead personnel for jobsuperintendent, quality control, safety, incidental laborer support, field office staff, and projectmanagement; vehicles used by overhead personnel; incidental project engineering; safety equipment andmaterial; quality control (testing, reports, etc); scheduling; temporary facilities, offices, utilities, storagesheds, and tool boxes; general supplies; fencing, barricades, and other site protection/control; temporaryhaul roads, parking, staging or laydown areas; daily clean-up and site control; indirect equipment (i.e.,forklift for unloading material); small tools; and builders insurance/general liability insurance.Change Order Form- the format for submitting all modification proposals (including Request forEquitable Adjustments and/or claims) shall be on the Cost Analysis Worksheet (Section 00100Attachment E)<strong>Part</strong> 1 - Page 16 of 37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!