10.2.1.4 Municipal Public Lighting<br />

<strong>Actio</strong>n 1.11: Conduct an e<strong>nergy</strong> audit for municipal lighting facilities in<br />

the locality to assess the adequacy of public lighting and identify methods<br />

to improve e<strong>nergy</strong> efficiency.<br />

A detailed e<strong>nergy</strong> audit of municipal public lighting shall be undertaken to<br />

assess the adequacy of public lighting and identify methods to improve<br />

e<strong>nergy</strong> efficiency.<br />

<strong>Actio</strong>n 1.12: Install intelligent street lighting control systems in all<br />

substations.<br />

By installing intelligent (such as adaptive) street lighting control systems in<br />

the locality, it is predicted that around 25% of e<strong>nergy</strong> used for street<br />

lighting can be reduced. This would equate to a reduction of 41.60 tCO2<br />

emissions annually.<br />

It is expected that such a system would cost around € 110,000 for the<br />

whole locality with a payback period in the order of 3 years. Funding from<br />

central government may be required for this action.<br />

48