Sust Qre tainab endi, M ble En Malta nergy Actio n Plan n
Sust Qre tainab endi, M ble En Malta nergy Actio n Plan n
Sust Qre tainab endi, M ble En Malta nergy Actio n Plan n
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
10.2.1.4 Municipal Public Lighting<br />
<strong>Actio</strong>n 1.11: Conduct an e<strong>nergy</strong> audit for municipal lighting facilities in<br />
the locality to assess the adequacy of public lighting and identify methods<br />
to improve e<strong>nergy</strong> efficiency.<br />
A detailed e<strong>nergy</strong> audit of municipal public lighting shall be undertaken to<br />
assess the adequacy of public lighting and identify methods to improve<br />
e<strong>nergy</strong> efficiency.<br />
<strong>Actio</strong>n 1.12: Install intelligent street lighting control systems in all<br />
substations.<br />
By installing intelligent (such as adaptive) street lighting control systems in<br />
the locality, it is predicted that around 25% of e<strong>nergy</strong> used for street<br />
lighting can be reduced. This would equate to a reduction of 41.60 tCO2<br />
emissions annually.<br />
It is expected that such a system would cost around € 110,000 for the<br />
whole locality with a payback period in the order of 3 years. Funding from<br />
central government may be required for this action.<br />
48