09.07.2015 Views

No 7 Secaucus Extension Final Report - NYCEDC

No 7 Secaucus Extension Final Report - NYCEDC

No 7 Secaucus Extension Final Report - NYCEDC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>No</strong>. 7 <strong>Secaucus</strong> <strong>Extension</strong>Feasibility Analysis <strong>Final</strong> <strong>Report</strong>3 STATIONSNew York-Existing StationsThe <strong>No</strong>. 7 <strong>Secaucus</strong> <strong>Extension</strong> would result in increased passenger volumes at each of the threeexisting <strong>No</strong>. 7 stations in Manhattan: Times Square, 5 th Avenue/Bryant Park, and Grand Central.Working together, NYCT Operations Planning staff and the project team projected the increasedvolumes at each station and developed conceptual improvement measures.NJ TRANSIT analyzed three scenarios using their forecasting model, which includes trans-Hudsontravel:Existing conditionFuture 2035 <strong>No</strong>-Build, which included the <strong>No</strong>. 7 <strong>Extension</strong> to West 34 th Street and 11 th Avenueas well as committed real estate development projects and projected growth, and does notinclude the deferred <strong>No</strong>. 7 10 th Avenue Station or the existing station improvementsFuture 2035 Build with the <strong>No</strong>. 7 <strong>Secaucus</strong> <strong>Extension</strong>NYCT conducted passenger flows counts on key vertical circulation elements (VCEs) at the threestations in March 2011. NYCT developed future <strong>No</strong>-Build volumes, based on the growthprojected in the Hudson Yards EIS, but adjusting for the fact that there would not be a 10 thAvenue station. Build volumes on key station elements were developed by using incrementalvolumes from the NJ TRANSIT model between the <strong>No</strong>-Build and Build scenarios.Specific improvements to accommodate <strong>No</strong>-Build volume increases were first developed basedon the incremental volumes for each existing station. Additional improvement measures werethen developed to accommodate passenger volumes associated with the <strong>No</strong>. 7 <strong>Secaucus</strong><strong>Extension</strong>. The improvements and VCE analyses are addressed in detail below, and Tables 1 and2 provide a summary of the proposed improvement measures in the <strong>No</strong>-Build and with the <strong>No</strong>. 7<strong>Secaucus</strong> <strong>Extension</strong>.11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!