10.07.2015 Views

SOP for Post Entry Quarantine Inspection - Plant quarantine India

SOP for Post Entry Quarantine Inspection - Plant quarantine India

SOP for Post Entry Quarantine Inspection - Plant quarantine India

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>SOP</strong>s <strong>for</strong> <strong>Post</strong>entry <strong>Quarantine</strong> <strong>Inspection</strong>Section-3 Technical Assessment of PEQ Facilities Page 1 of 9December 20073.1. A team of nominated experts will undertake the site visit <strong>for</strong> on-spot technical assessment of thefacility on scheduled date and time as communicated earlier.3.2. The technical assessement of the facilities will include physical examination of the facility to verifythat the facility meet the criteria laid down under Annexure-3A and also examination of recordsmaintained at the facility, procedures practiced and testing the skill competency of technical staffoperating the facility.3.3. The team of nominated experts, at the end of visit, will prepare an assessment report in theprescribed <strong>for</strong>mat separately <strong>for</strong> open field <strong>quarantine</strong> facilities (Annexure-3B) and closed<strong>quarantine</strong> facilities (Annexure-3C) together with the comments/recommendations and correctiveactions, if any suggested. The assessment report will be duly signed by the facility owner/operatorand the leader of the inspecting team.3.4. If any corrective actions are required, the inspection authority will communicate the owner of thefacility the corrective actions required to be undertaken and the time schedules <strong>for</strong> correctiveaction to be implemented.3.5. The facility will be re-inspected by the same nominated experts after the scheduled time period toverify the corrective actions are undertaken3.6. If satisfied, the team of experts will recommend the facilities <strong>for</strong> approval and certification by theinspection Authority3.7. If required corrective actions are not satisfactorily undertaken, the inspection authority may rejectthe application <strong>for</strong> certification of facilities and in<strong>for</strong>m the facility owner as per the <strong>for</strong>matprescribed in Anexure-4B.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!