SOP for Post Entry Quarantine Inspection - Plant quarantine India
SOP for Post Entry Quarantine Inspection - Plant quarantine India
SOP for Post Entry Quarantine Inspection - Plant quarantine India
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
10 I/we agree to maintain basic inspection tools like hand lens, field lens or illuminated magnifier, surgicalspirit, dissection box, absorbent cotton, screw caped glass vials, labels etc., <strong>for</strong> the purpose of carrying outinspection.11. I/we agree to the condition that no liability lies with IA/PQO towards loss/damage caused to any plantmaterial/destruction of the same in the event of infection/infestation by a <strong>quarantine</strong> pest/pathogen.12. I/we agree to the condition that in the event of non-compliance with the terms and conditionstated above, I/we <strong>for</strong>feit the future claim and right <strong>for</strong> issue of permit.Date: ____________________________________________Name & Signature Importer/AgentPlace & Address:___________________________________________________________________________N.B.: The Importer/Agent is required to submit the above undertaking in duplicate to PQO at designated port, theduplicate copy which will be <strong>for</strong>warded to respective inspection authority (IA) along with intimation letter to IA.32