10.07.2015 Views

Nkamouna Project Environmental & Social Assessment Executive ...

Nkamouna Project Environmental & Social Assessment Executive ...

Nkamouna Project Environmental & Social Assessment Executive ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

alternatives. The preferred alternative (lowest overall score) was selected in all cases except for powergeneration and water supply. The Combined Heat and Power and Diesel Power alternatives can only beseparated on the basis of their cost score. GeoCam plans to use Diesel Power generation alternativedue to its easier construction and lower potential impacts on local fauna. The Well field option and theWater extracted from Edjé River plus water from the TSF option both received the same score. TheWater extracted from the Edjé River option is favored as it reduces the risk for social conflict between themine and downstream users of surface waters.Table 2.2 summarizes the key differences between these alternatives.<strong>Executive</strong> Summary, Rev 02-13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!