10.07.2015 Views

Nkamouna Project Environmental & Social Assessment Executive ...

Nkamouna Project Environmental & Social Assessment Executive ...

Nkamouna Project Environmental & Social Assessment Executive ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 2.2Geovic Cameroon PLC<strong>Nkamouna</strong> <strong>Project</strong><strong>Environmental</strong> and <strong>Social</strong> <strong>Assessment</strong><strong>Executive</strong> SummaryAlternative Analysis SummaryRefinery AlternativesPower Generation AlternativesCriteriaCriteria Weighting Refinery with Cyanex Refinery with Cyanex No Refinery, Production of Diesel Power Combined Heat and PowerFactor301272 Intermediate Cobalt-Nickel Generation Generation (Wood Fueled)Hydropower GenerationRankWeightedWeightedWeightedRankRank Weighted Rank RankRankRankRankRank Weighted Rank Rank Weighted RankOverall protection of human health and the environment 4 2 8 2 8 2 8 2 8 2 8 2 8Compliance with IFC Performance Standards 4 1 4 1 4 1 4 1 4 1 4 2 8Climate 4 1 4 1 4 1 4 2 8 2 8 1 4Air Quality 3 2 6 2 6 1 3 2 6 2 6 1 3Surface Water Resources 3 1 3 1 3 1 3 1 3 1 3 2 6Groundwater Resources 3 1 3 1 3 1 3 1 3 1 3 1 3Flora 2 1 2 1 2 1 2 1 2 2 4 1 2Fauna 2 1 2 1 2 1 2 1 2 1 2 1 2Constructability 2 3 6 2 4 2 4 1 2 2 4 4 8Cost 2 4 8 4 8 2 4 4 8 1 2 4 8TOTAL WEIGHTED RANK 46 44 37 46 44 52Notes:- Descriptions of the Alternative Options are presented in Section 8.0- Criteria weighting factors: 1 = considered as not significant; 2 = considered as moderately important; 3 = considered very important, and 4 = considered as critical.- Option Ranking: 1 = indicates the option meets or exceeds the criteria; 2 = indicates the option slightly compromises the criteria; 3 = indicates significant compromise of the criteria,and 4 = indicates the option does not meet the criteria.- Cost ranked by highest = 4, medium = 3, moderate = 2, lowest = 1.- Fresh and recycled water are parts of an integrated system- Lowest score indicates the most favorable option.G:\302\00009.13\Deliverables\Reports Specs\ExecSummary\Rev0\Tables\Table2_2, 2_2 Page 3 of 4 April 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!