LAKE HAVASU CITY, ARIZONA FILE: LHC.xls<strong>2008</strong> WATER RATE AND FEE STUDY SCHEDULE: COSESTIMATED UNITS OF SERVICE DATE: 05/04/09RANGE: SERVUNITS(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)Maximum Day Dem<strong>and</strong><strong>Water</strong> Use Maximum Hour Dem<strong>and</strong> Direct IndirectLine Average Dem<strong>and</strong> Total Extra Dem<strong>and</strong> Total Extra Eq. Meters Eq. Meters Weighted WeightedNo. Customer Class Annual Day Factor Dem<strong>and</strong> Dem<strong>and</strong> Factor Dem<strong>and</strong> Dem<strong>and</strong> Bills (Meter Cap.) (Meter Cost) Fire Units Fire Unitscf cf pd cf pd cf pd cf pd cf pdInside District1 Non-SFR Irrigation Only 48,505,035 132,891 200% 266,274 133,383 313% 416,053 149,779 4,891 886 1,282 0 02 Commercial & Industrial 63,179,487 173,095 166% 287,337 114,242 259% 448,964 161,627 13,091 2,405 3,277 0 137,455,5003 Hydrants 8,477,523 23,226 282% 65,573 42,347 441% 102,458 36,885 894 777 1,050 0 04 SFR - Irrigation Only 23,860,511 65,371 201% 131,633 66,262 315% 205,676 74,044 11,215 955 946 0 05 Multifamily Residential 46,647,466 127,801 173% 221,347 93,546 271% 345,855 124,508 16,049 2,456 2,854 0 80,245,0006 RV Park 2,583,974 7,079 178% 12,595 5,516 278% 19,680 7,085 48 43 55 0 144,0007 Single-Family Residential 352,490,000 965,726 157% 1,520,268 554,542 246% 2,375,419 855,151 299,852 25,162 25,073 0 899,556,0008 Total Inside District 545,743,996 1,495,189 2,505,027 1,009,838 3,914,105 1,409,078 346,040 32,684 34,537 - 1,117,400,500Outside District9 Non-SFR Irrigation Only 430,476 1,179 200% 2,363 1,184 313% 3,693 1,329 449 64 109 0 010 Commercial & Industrial 2,266,640 6,210 166% 10,309 4,099 259% 16,107 5,799 75 20 42 0 787,50011 Hydrants 586,123 1,606 282% 4,534 2,928 441% 7,084 2,550 48 43 63 0 012 SFR - Irrigation Only 0 0 201% 0 0 315% 0 0 0 0 0 0 013 Multifamily Residential 0 0 173% 0 0 271% 0 0 0 0 0 0 014 RV Park 0 0 178% 0 0 278% 0 0 0 0 0 0 015 Single-Family Residential 1,239,280 3,395 157% 5,345 1,950 246% 8,352 3,007 1,236 103 103 0 3,708,00016 Total Outside District 4,522,519 12,391 22,550 10,160 35,235 12,685 1,808 230 317 - 4,495,500Fire Protection17 Inside District 839 839 6,711 5,87218 Outside District 3 3 27 2419 Total Fire Protection 842 842 6,738 5,89520 Total System 550,266,515 1,507,580 2,528,420 1,020,840 3,956,077 1,427,658 347,848 32,914 34,854 0 1,121,896,000Page B - 9
LAKE HAVASU CITY, ARIZONA FILE: LHC.xls<strong>2008</strong> WATER RATE AND FEE STUDY SCHEDULE: COSDEVELOPMENT OF UNIT COSTS OF SERVICE DATE: 05/04/09RANGE:ULTUNITS(1) (2) (3) (4) (5) (6) (7) (8)CustomerExtra Capacity Local Billing/Line Maximum Maximum Distribution Meters <strong>and</strong> Customer Direct FireNo. Description Total Base Day Hour Lines Services Service Protection$ $ $ $ $ $ $ $Revenue Requirements - $1 Operating Costs $10,208,378 $4,932,212 $2,117,909 $1,285,815 $1,446,597 $212,922 $212,922 $02 Capital Costs 6,353,844 2,679,269 1,706,580 933,881 1,034,114 0 0 03 Total Revenue Requirements 16,562,222 7,611,480 3,824,489 2,219,696 2,480,712 212,922 212,922 0Revenue Requirement Adjustments4 Interest Income (157,595) (72,426) (36,391) (21,121) (23,605) (2,026) (2,026) 05 Miscellaneous <strong>Water</strong> <strong>Fee</strong>s (78,823) (36,225) (18,202) (10,564) (11,806) (1,013) (1,013) 06 IDD Property Tax (3,269,298) (1,502,466) (754,935) (438,157) (489,680) (42,030) (42,030) 07 IDD Debt Service Property Tax (19,346) (8,890) (4,467) (2,593) (2,898) (249) (249) 08 Federal Grants 0 0 0 0 0 0 0 09 Meter <strong>Fee</strong>s (237,120) (108,974) (54,755) (31,779) (35,516) (3,048) (3,048) 010 Turn on <strong>Fee</strong>s (165,825) (76,208) (38,292) (22,224) (24,837) (2,132) (2,132) 011 Backflow Prevention Permits (12,060) (5,543) (2,785) (1,616) (1,806) (155) (155) 012 Horizon Six <strong>Fee</strong>s (4,925) (2,264) (1,137) (660) (738) (63) (63) 013 Repayment of Loan from Devel. <strong>Fee</strong> Subfund 0 0 0 0 0 0 0 014 Loan (To) Devel. <strong>Fee</strong> Subfund 0 0 0 0 0 0 0 015 Transfer From / (To) Wastwater Fund 2,000,000 919,137 461,833 268,043 299,563 25,712 25,712 016 <strong>Rate</strong> Revenue for Full-Year Increase 0 0 0 0 0 0 0 017 Non-Growth Bond Proceeds, Issuance Costs, DSR (10,108,505) (4,645,554) (2,334,220) (1,354,758) (1,514,065) (129,954) (129,954) 018 Increase (Decrease) in Operating Reserves 7,041,008 3,235,826 1,625,885 943,647 1,054,612 90,519 90,519 019 Total Revenue Requirement Adjustments (5,012,488) (2,303,586) (1,157,466) (671,782) (750,776) (64,439) (64,439) 020 Net Cost of Service $11,549,735 $5,307,895 $2,667,023 $1,547,914 $1,729,936 $148,483 $148,483 $0Units of Service Eq. Meters Eq. Meters Direct Weighted21 Units CF CFPD 1,000 gpd (Meter Cap.) (Meter Cost) # of bills Fire Units22 Inside District 545,743,996 1,010,677 1,414,950 32,684 34,537 346,040 023 Outside District 4,522,519 10,163 12,708 230 317 1,808 024 Total Units of Service 550,266,515 1,020,840 1,427,658 32,914 34,854 347,848 0Inside District Unit Costs of Service - $/unit25 Operation <strong>and</strong> Maintenance Expense $0.009 $2.070 $0.899 $43.874 $6.095 $0.61126 Capital Costs 0.005 1.668 0.653 31.364 0.000 0.00027 Adjustments (0.004) (1.131) (0.470) (22.770) (1.845) (0.185)28 Total Inside District Unit Costs 0.010 2.606 1.082 52.468 4.250 0.426 0.000Outside District Unit Costs of Service - $/unit29 Operation <strong>and</strong> Maintenance Expense 0.011 2.587 1.123 54.843 7.619 0.764 0.00030 Capital Costs 0.006 2.084 0.816 39.205 0.000 0.000 0.00031 Adjustments (0.005) (1.414) (0.587) (28.463) (2.306) (0.231) 0.00032 Total Outside District Unit Costs $0.012 $3.258 $1.352 $65.585 $5.313 $0.533 $0.000Page B - 10
- Page 1 and 2:
Lake Havasu City2330 McCulloch Blvd
- Page 3 and 4:
Table of Contents6.4.1. Water Alloc
- Page 5 and 6:
Section 1Executive SummaryFuture ra
- Page 8 and 9:
2. Introduction2.1. Overview and Pu
- Page 10 and 11:
3. Utility Accounts and Use3.1. Wat
- Page 12 and 13:
Section 4Financial PlanTable 4-2.Ph
- Page 14 and 15: Section 4Financial Planperiod. The
- Page 16 and 17: Section 5Cost-of-ServiceCity’s wa
- Page 18 and 19: 5.3. Allocation of Costs to Custome
- Page 20 and 21: Table 6-1.Existing and Proposed Bas
- Page 22 and 23: Section 6Proposed FY 2009-10 Rates
- Page 24 and 25: Lake Havasu City2008 Water Rate and
- Page 26 and 27: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 28 and 29: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 30 and 31: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 32 and 33: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 34 and 35: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 36 and 37: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 38 and 39: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 40 and 41: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 42 and 43: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 44 and 45: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 46 and 47: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 48 and 49: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 50 and 51: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 52 and 53: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 54 and 55: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 56 and 57: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 58 and 59: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 60 and 61: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 62 and 63: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 66 and 67: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 68 and 69: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 70 and 71: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 72 and 73: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 74 and 75: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 76 and 77: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 78 and 79: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 80 and 81: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 82 and 83: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 84 and 85: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 86 and 87: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 88 and 89: LAKE HAVASU CITY, ARIZONA FILE: LHC
- Page 90 and 91: LAKE HAVASU CITY, ARIZONAFILE:LHC A
- Page 92 and 93: LAKE HAVASU CITY, ARIZONAFILE:LHC A
- Page 94: LAKE HAVASU CITY, ARIZONAFILE:LHC A