2008 Water Rate and Fee Study - Lake Havasu City
2008 Water Rate and Fee Study - Lake Havasu City
2008 Water Rate and Fee Study - Lake Havasu City
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
2. Introduction2.1. Overview <strong>and</strong> Purpose<strong>Lake</strong> <strong>Havasu</strong> <strong>City</strong> (<strong>City</strong>) retained Red Oak Consulting (Red Oak) to complete a <strong>Water</strong><strong>Rate</strong> <strong>and</strong> <strong>Fee</strong> <strong>Study</strong> (<strong>Study</strong>). The purpose of the <strong>Study</strong> was to develop a financial plan<strong>and</strong> rate <strong>and</strong> fee structure to promote self-sustainability of the <strong>City</strong>’s water operations,<strong>and</strong> to recommend rates for service consistent with the financial plan requirements <strong>and</strong> inline with the <strong>City</strong>’s pricing objectives.As part of the <strong>Study</strong>, Red Oak assisted the <strong>City</strong> to:• Develop an eleven year water enterprise financial plano Evaluate alternative capital improvement <strong>and</strong> capital funding scenarioso Evaluate creation of water system <strong>and</strong> water resource development feesinside the IDD as an additional revenue source funding growth-relatedcapital improvements.• <strong>City</strong> Council did not adopt water system or water resourcedevelopment fees inside the IDD.• Complete a cost-of-service analysis for fiscal year (FY) 2009-10• Develop three alternative water rate structures to fund water rate revenuerequirements.o Evaluate two alternative increases to the Irrigation <strong>and</strong> Drainage District(IDD) property tax revenue to reduce the magnitude of water rateincreases.• Develop <strong>and</strong> deliver a financial planning, cost-of-service, <strong>and</strong> rate design model<strong>and</strong> user manual.Components of this project include:• Identify <strong>and</strong> project costs associated with the operation of the <strong>City</strong>’s watersystem.• Analyze the existing rate structure for appropriateness <strong>and</strong> sufficiency of revenuegenerated.• Develop a multi-year financial plan based on information gathered in the courseof the study.• Determine the system’s ability to support debt required for planned capitalprojects.• Complete a cost-of-service analysis for FY 2009-10 test year.<strong>Lake</strong> <strong>Havasu</strong> <strong>City</strong><strong>2008</strong> <strong>Water</strong> <strong>Rate</strong> <strong>and</strong> <strong>Fee</strong> <strong>Study</strong>49440142-1