®Herbert Construction Co.Bridge ConstructionCustomer:Herbert Construction Co. ($70,000,000bridge over the Mobile River)Application:Pull suspension cables, move concreteforms, tensioning Dywidag bars.Solution:PE2004S for cables and form moving.PE554 for tensioning.Result:The 15 Power Team pumps performedwithout a problem.7676Rev. 10-21-95