®T.I.C. contractor and Falkirk MineMining/QuarryingCustomer:T.I.C. contractor and Falkirk Mine(North Dakota)Application:Lift a 6 story, 13.6 million lb. draglinefor repair.Solution:17 RD5006 rams mounted with PO checksand PE194 pumps. The whole works wascontrolled from a central panel with gaugesmounted for each unit.Result:It was easy to control and everythingworked well. “The nicest system I’veworked with,” said T.I.C. super. “We’lldefinitely go with that system again.”9494Rev. 10-21-95