- Page 1 and 2:
LISBONSTRATEGYNATIONALPLANOFREFORMS
- Page 3 and 4:
PRESIDÊNCIADOCONSELHODEMINISTROSGA
- Page 5 and 6:
#1PARTPNACE2005/2008AProgrammeinful
- Page 7 and 8:
|INTRODUCTIONPNACE2005/2008isanagen
- Page 9 and 10:
Within this strategic framework, Po
- Page 11 and 12:
|Responsetorecommendation1:• Theg
- Page 13 and 14:
Thestructuresthatmakeupthesystemare
- Page 15 and 16:
nationalandinternationalmobilityofs
- Page 17 and 18:
|3. MODERNISING LEGISLATION AND EMP
- Page 19 and 20:
Responsetorecommendation3:Consolida
- Page 21 and 22:
companiesbyattractingproductiveinve
- Page 23 and 24:
oadband); Portugal was ranked third
- Page 25 and 26:
December,andnº171/2007dated8thMay,
- Page 27 and 28:
urdens maintained, eliminated, redu
- Page 29 and 30:
The ministries’ commitment to thi
- Page 31 and 32:
|9.REDUCTIONOFGREENHOUSEGASEMISSION
- Page 33 and 34:
friendly environment (including acc
- Page 35 and 36:
The Local Social Development Contra
- Page 37 and 38:
|INDEXIntroduction.................
- Page 39 and 40:
modernisation of the public service
- Page 41 and 42:
are transversal to all areas such a
- Page 43 and 44:
In its current formulation, the app
- Page 45 and 46:
objectivealongwithitsimpactsonthein
- Page 47 and 48:
Measures1.1.1. ConsolidationandSust
- Page 49 and 50:
In the scope of the planning, contr
- Page 51 and 52:
• Increase in qualifications and
- Page 53 and 54:
• In relation to the tax system,
- Page 55 and 56:
partycandelivertoanypublicorprivate
- Page 57 and 58:
• Preparation of a practical guid
- Page 59 and 60:
continuingthereductionofadministrat
- Page 61 and 62:
• Client/SupplierProgramme.Thepro
- Page 63 and 64:
commercialisation of technologies,
- Page 65 and 66:
• Sustainedexploitationofresource
- Page 67 and 68:
services by 31/12/2010 (including n
- Page 69 and 70:
|AREA3-MORER&DANDABETTERINNOVATIONS
- Page 71 and 72:
competitiveness,employmentandinnova
- Page 73 and 74:
• PortuguesePresidencyoftheEurope
- Page 75 and 76:
actionsareplannedperyearleadingtoth
- Page 77 and 78:
disseminating the practice of open
- Page 79 and 80:
preference to interventions oriente
- Page 81 and 82:
• Solar:Constructionofthebiggestp
- Page 83 and 84:
• Photovoltaic:MouraPowerStationw
- Page 85 and 86:
|AREA 5 - MORE POSITIVE MOBILITY TH
- Page 87 and 88:
ealisationofthisreformprocesswaswid
- Page 89 and 90:
(EFAcourses)aswellasvalorisingprofe
- Page 91 and 92:
throughoutthecountry.Theobjectiveof
- Page 93 and 94:
computer with broadband internet co
- Page 95 and 96:
promotingthismobility,asistheeffect
- Page 97 and 98:
o Recognitionofqualificationsthroug
- Page 99 and 100:
the alteration of the survival syst
- Page 101 and 102:
o ContinuationoftheAnnualNationalPl
- Page 103 and 104:
o SocialFacilities.TheboostintheSoc
- Page 105 and 106:
|AREA6-PROMOTINGANINTELLIGENTTERRIT
- Page 107 and 108:
national market, covering more than
- Page 109 and 110:
most suitable means of transport fo
- Page 111 and 112:
statisticsandinformationstructuresi
- Page 113 and 114:
• UpdatingoftheCleanSeaPlan;• A
- Page 115 and 116:
#3PARTOUTCOMEOFPNACEEXECUTION2005
- Page 117 and 118:
|INTRODUCTIONInordertoemphasisethee
- Page 119 and 120:
levelofsustainabilityofeducationand
- Page 121 and 122:
The Government has strengthened its
- Page 123 and 124:
Consideringtheoutcomeoffightingfrau
- Page 125 and 126:
TheworkofCOPhasbeencomplementedbyan
- Page 127 and 128:
Asforpublicworkers’SocialSecurity
- Page 129 and 130:
ministries’centralservices,streng
- Page 131 and 132:
The“SuccessionandInheritance”Pr
- Page 133 and 134:
República.The information and elec
- Page 135 and 136:
(3) Science and Technology Infrastr
- Page 137 and 138:
WithinthescopeoffulfillingthePledge
- Page 139 and 140:
Establishedin2006,theinnovativeprog
- Page 141 and 142:
• TheLiveScienceCentresNetworkwas
- Page 143 and 144:
In particular we highlight the rece
- Page 145 and 146:
the National Strategy for the Sea,
- Page 147 and 148:
At a local level, the sustainable d
- Page 149 and 150:
Equallydirectedtowardsentrepreneurs
- Page 151 and 152:
The pilot‐project lasted a total
- Page 153 and 154:
with the objective of stimulating i
- Page 155 and 156:
Support Offices, IRC/EIC - Innovati
- Page 157 and 158:
operatingoneofaround60Tier2worldcen
- Page 159 and 160:
Driver5.EnergyEnergypolicyisincreas
- Page 161 and 162:
• Hydro/energy:Bringingforwardthe
- Page 163 and 164:
Driver6.PortugalLogisticoLogisticsS
- Page 165 and 166:
includesthepublicationofDecreeLaw15
- Page 167 and 168: ApprovaloftheLawOnPortscreatedaregu
- Page 169: Eightcoastalstations(fromMinhotothe
- Page 172 and 173: market with negative reflexes, nota
- Page 174 and 175: theregionofLisbon(AlcoaFujikura,whi
- Page 176 and 177: first time since 2002, the total nu
- Page 178 and 179: certificationandinclusioninthesuppl
- Page 180 and 181: and means of proof of the actions u
- Page 182 and 183: 12,500workposts.Furthermore,twoproc
- Page 184 and 185: oth prevention and monitoring and r
- Page 186 and 187: Portugal, responding objectively to
- Page 188 and 189: • ThePEJENEProgrammewasstrengthen
- Page 190 and 191: timely recovery from the country’
- Page 192 and 193: ofintervention.- As a complement to
- Page 194 and 195: torespondtoitsprimarygoalofprovidin
- Page 196 and 197: ANNEXES1
- Page 198 and 199: |LINKSTOCONNECTEDPROGRAMMESANDRELEV
- Page 200 and 201: • NEOTEC-NewTechnologicallyBasedC
- Page 202 and 203: http://www.portugal.gov.pt/Portal/P
- Page 204 and 205: 9• NewOpportunitiesCentrefortheme
- Page 206 and 207: three pillars of the PT (Knowledge,
- Page 208 and 209: necessary to think in terms of the
- Page 210 and 211: ANNEX-ResultsIndicators15
- Page 212 and 213: • ForeigndirectinvestmentinPortug
- Page 214 and 215: which determine the definition of t
- Page 216 and 217: esourcesinalimitedrangeofOperationa
- Page 220 and 221: New Measures of the National Reform
- Page 222 and 223: MeasureDescriptionCurrentstatus: in
- Page 224 and 225: MeasureDescriptionCurrentstatus: in
- Page 226 and 227: MeasureDescriptionCurrentstatus: in
- Page 228 and 229: MeasureDescriptionCurrentstatus: in
- Page 230 and 231: MeasureDescriptionCurrentstatus: in
- Page 232 and 233: MeasureDescriptionCurrentstatus: in
- Page 234 and 235: MeasureDescriptionCurrentstatus: in
- Page 236 and 237: MeasureDescriptionCurrentstatus: in
- Page 238 and 239: MeasureDescriptionCurrentstatus: in
- Page 240 and 241: MeasureDescriptionCurrentstatus: in
- Page 242 and 243: MeasureDescriptionCurrentstatus: in
- Page 244 and 245: MeasureDescriptionCurrentstatus: in
- Page 246 and 247: MeasureDescriptionCurrentstatus: in
- Page 248 and 249: MeasureDescriptionCurrentstatus: in
- Page 250 and 251: MeasureDescriptionCurrentstatus: in
- Page 252 and 253: MeasureDescriptionCurrentstatus: in
- Page 254 and 255: MeasureDescriptionCurrentstatus: in
- Page 256 and 257: MeasureDescriptionCurrentstatus: in
- Page 258 and 259: MeasureDescriptionCurrentstatus: in
- Page 260 and 261: MeasureDescriptionCurrentstatus: in
- Page 262 and 263: MeasureDescriptionCurrentstatus: in
- Page 264 and 265: MeasureDescriptionCurrentstatus: in
- Page 266 and 267: MeasureDescriptionCurrentstatus: in
- Page 268 and 269:
MeasureDescriptionCurrentstatus: in
- Page 270 and 271:
MeasureDescriptionCurrentstatus: in
- Page 272 and 273:
MeasureDescriptionCurrentstatus: in
- Page 274 and 275:
MeasureDescriptionCurrentstatus: in
- Page 276 and 277:
PNACE 2005-2008Results of Measures
- Page 278 and 279:
MeasureDescriptionCurrentStatus: in
- Page 280 and 281:
MeasureDescriptionCurrentStatus: in
- Page 282 and 283:
MeasureDescriptionCurrentStatus: in
- Page 284 and 285:
MeasureDescriptionCurrentStatus: in
- Page 286 and 287:
MeasureDescriptionCurrentStatus: in
- Page 288 and 289:
MeasureDescriptionCurrentStatus: in
- Page 290 and 291:
MeasureDescriptionCurrentStatus: in
- Page 292 and 293:
MeasureDescriptionCurrentStatus: in
- Page 294 and 295:
MeasureDescriptionCurrentStatus: in
- Page 296 and 297:
MeasureDescriptionCurrentStatus: in
- Page 298 and 299:
MeasureDescriptionCurrentStatus: in
- Page 300 and 301:
MeasureDescriptionCurrentStatus: in
- Page 302 and 303:
MeasureDescriptionCurrentStatus: in
- Page 304 and 305:
MeasureDescriptionCurrentStatus: in
- Page 306 and 307:
MeasureDescriptionCurrentStatus: in
- Page 308 and 309:
MeasureDescriptionCurrentStatus: in
- Page 310 and 311:
MeasureDescriptionCurrentStatus: in
- Page 312 and 313:
MeasureDescriptionCurrentStatus: in
- Page 314 and 315:
MeasureDescriptionCurrentStatus: in
- Page 316 and 317:
MeasureDescriptionCurrentStatus: in
- Page 318 and 319:
MeasureDescriptionCurrentStatus: in
- Page 320 and 321:
MeasureDescriptionCurrentStatus: in
- Page 322 and 323:
MeasureDescriptionCurrentStatus: in
- Page 324 and 325:
MeasureDescriptionCurrentStatus: in
- Page 326 and 327:
MeasureDescriptionCurrentStatus: in
- Page 328 and 329:
MeasureDescriptionCurrentStatus: in
- Page 330 and 331:
MeasureDescriptionCurrentStatus: in
- Page 332 and 333:
MeasureDescriptionCurrentStatus: in
- Page 334 and 335:
MeasureDescriptionCurrentStatus: in
- Page 336 and 337:
MeasureDescriptionCurrentStatus: in
- Page 338 and 339:
MeasureDescriptionCurrentStatus: in
- Page 340 and 341:
MeasureDescriptionCurrentStatus: in
- Page 342 and 343:
MeasureDescriptionCurrentStatus: in