10.07.2015 Views

NRP Portugal

NRP Portugal

NRP Portugal

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

• Photovoltaic:MouraPowerStationwithaforecastproductionof56GWh/year, the setting up of a photovoltaic module factory and aresearchlaboratory.SerpaPowerStationwithaforecastproductionofover18GWh/year;• Micro‐generation:Simplifyingthelegallicensingsystem,substitutingtheexistingonewitharegistrationsystemsubjecttoaninspectionoftechnicalconformity.SystemfortheRegistrationofMicro‐productionsetup(SRM).4.3. Conversionofthenationalrefinerysector• Porto Refinery: Grant the refinery with a new conversion unit forheavycrudeoilthroughtheassociationsofthermalcrackingunitsandhydrocrackingtoobtaindieselwithahighenvironmentalquality.Theaim is to build two new main units and three auxiliary units in thePorto Refinery by the end of 2010; reconfigure three existing unitsandonenewstorageunit.• SinesRefinery:Increasethedieselproductioncapacity,byconversionfrom vacuum heavy diesel and from visbreaking heavy dieselreadjusting the production profile to the market needs. Four mainunitsandthreeauxiliaryunitswillbebuiltattheSinesRefinery,threeexistingunitsreconfiguredandanewunitformakingsulphurpelletsandanewstorageunitwillbebuilt.4.4. WasteTreatment• ConstructionofUnitsfortheOrganicValorisationofUrbanSolidWaste.Inthe ambit of the strategy for diverting biodegradable waste from landfillsincorporatedinthePERSUII(2007‐2016),fromtheperspectiveofcomplyingwithcommunitytargetsconsignedintheLandfillDirective,theunitsfortheorganic valorisation existing in <strong>Portugal</strong> are expected to increasesubstantially.• Hospital Waste Treatment. Construction and exploration of an IntegratedCentreofEnergyValorisation,RecyclingandTreatmentofHospital,Industryand Animal Waste based on the international best practices of wastetreatment with a view to minimising the environmental impact andmaximising energy efficiency and generating carbon credits. Launch Oct2008• ConstructionofunitsfortheenergyvalorisationofsludgefromETARandCDR.WithaviewtoresolvingtheproblemofthefinaldestinationofsludgeandofwastefromthevariousMulti‐municipalSystems,twoStationsfortheEnergyvalorisationofsludgeandfuelderivedfromwaste(inEstarreja)and48

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!