10.07.2015 Views

Annexure A

Annexure A

Annexure A

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SCHEDULESSCHEDULE 'A'Schedule of Quantities :- Attached.SCHEDULE 'B'Schedule of materials to be issued to the contractor.Sl. No. Description of Item Quantity Rates in figures & words at Place of Issuewhich the material will becharged to the contractor1 2 3 4 5SCHEDULE 'C'Tools and Plants to be hired to the contractorAs per <strong>Annexure</strong>Sl. No. Description Hire charges per day Place of issueSCHEDULE 'D'1 2 3 4--------------------NIL---------------Extra schedule for specific requirements/documents for the work, if any.NilSCHEDULE 'E'Schedule of component of Cement, Steel, Other Materials, Labour etc. for Price escalation.CLAUSE 10 CC --- Not applicableComponent of Cement - Expressed as per cent of total value of work Xc --------------- %Component of Steel - Expressed as per cent of total value of work Xs --------------- %Component of civil (except cement & steel)/Electrical construction Materials -Expressed as per cent of total value of work. Xm ---------------- %Component of Labour - Expressed as per cent of total value of work Y ---------------- %Component of P.O.L. - Expressed as per cent of total value of work Z ---------------- %Not ApplicableSCHEDULE 'F'Reference to General conditions of contract :-General conditions of contract for CPWD works-2003 withamendments attached at page 17 to 30 and correction slips issuedupto the last date of issue of tender.Name of Work :- As per <strong>Annexure</strong>Estimate cost of Work :- Rs. As per <strong>Annexure</strong>(i) Earnest Money :- Rs. As per <strong>Annexure</strong>(ii) Performance Guarantee :- 5% of the tendered value of work.(iii) Security Deposit :- 5% of the tendered value of work.GENERAL RULES AND DIRECTIONS:Officer Inviting TenderMaximum percentage for quantity of items of work to be executedbeyond which rates are to be determined in accordance withClauses 12.2 & 12.3.Assistant Engineer (E) M-3524 / PWD EMDM-352See BelowDefinitions:2(v) Engineer-in-Charge Assistant Engineer (E) M-3524 / PWD EMDM-3522(viii) Accepting Authority Assistant Engineer (E) M-3524 / PWD EMDM-3522(x)Percentage on cost of materials andlabour to cover all overheads and profits. 15%2(xi) Standard Schedule of Rates DSR 1994/95 with Correction slips issued upto thelast date of issue of tenders.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!