10.07.2015 Views

Wind Power in Estonia - Elering

Wind Power in Estonia - Elering

Wind Power in Estonia - Elering

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1.4 RecommendationsBased on the analyses and the result <strong>in</strong> the study, the follow<strong>in</strong>g recommendationsseem justified:- It is technical possible and it might be socio economically beneficial todevelop w<strong>in</strong>d power further <strong>in</strong> <strong>Estonia</strong>. It is recommended to developw<strong>in</strong>d power gradually <strong>in</strong> order to ensure that the regulatory and <strong>in</strong>stitutionalframework is developed accord<strong>in</strong>gly.- It is recommended to conduct a study of the economic impact of aw<strong>in</strong>d power development plan, <strong>in</strong>clud<strong>in</strong>g a socio-economic study aswell as an analysis of the consequences for the different stakeholders<strong>in</strong> the <strong>Estonia</strong>n energy sector. The study could also <strong>in</strong>clude an analysisof the current and possible future <strong>in</strong>centive schemes for w<strong>in</strong>d power.- It is recommended to develop mechanisms for allocat<strong>in</strong>g of balanc<strong>in</strong>gcost to the different stakeholders <strong>in</strong> the energy sector- It is recommended that Eler<strong>in</strong>g cont<strong>in</strong>ue to improve forecast<strong>in</strong>g ofw<strong>in</strong>d power production- It is recommended to <strong>in</strong>troduce a system where Eler<strong>in</strong>g has the possibilityto activate reserves for compensat<strong>in</strong>g forecast errors and loadvariations- Rules for curtailment of w<strong>in</strong>d power and other power generat<strong>in</strong>g unitsexist today, but it might be necessary to develop the rules further, <strong>in</strong>clud<strong>in</strong>gdevelopment of compensation mechanisms for economiclosses <strong>in</strong> connection with curtailment- The development of w<strong>in</strong>d power <strong>in</strong> <strong>Estonia</strong> should be carried out <strong>in</strong>coherence with the development of the energy systems <strong>in</strong> theneighbour<strong>in</strong>g countries, especially <strong>in</strong> Latvia, Lithuania and F<strong>in</strong>land. Aclose cooperation with the TSOs <strong>in</strong> these countries on an optimal developmentand use of the electricity <strong>in</strong>frastructure and developmentof common rules and agreement for the future use and cooperation isstrongly recommended. Also a stronger and more market orientedcooperation with Russia should be pursued <strong>in</strong> order to benefit the developmentof w<strong>in</strong>d power <strong>in</strong> the Baltic States.15 | <strong>W<strong>in</strong>d</strong> <strong>Power</strong> <strong>in</strong> <strong>Estonia</strong>, 13-05-2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!