10.07.2015 Views

Wind Power in Estonia - Elering

Wind Power in Estonia - Elering

Wind Power in Estonia - Elering

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 11: <strong>W<strong>in</strong>d</strong> generation (blue) and Reserve requirement (red) time seriesfor a 2013 (the 600 first hours of the year), 900 MW w<strong>in</strong>d <strong>Estonia</strong> scenario.The figures concern only the requirements for up-regulation (lower w<strong>in</strong>dpower production than forecasted). The reserves cover both forecast errors <strong>in</strong>load and <strong>in</strong> w<strong>in</strong>d power production.5.2 Available load follow<strong>in</strong>g reserve capacity for up-regulationThe next step is to compare the requirement for reserves with the availableload follow<strong>in</strong>g capacity (up-regulation) <strong>in</strong> the system.By this we mean the assigned capacity leftover by the simulation tool (Balmorel),i.e. the total unused capacity of the power plants that operate <strong>in</strong> the<strong>Estonia</strong>n system and can be ramped up with<strong>in</strong> an hour accord<strong>in</strong>g to the optimizationsolution. This <strong>in</strong>cludes possibilities for import<strong>in</strong>g power at Estl<strong>in</strong>k 1, ifthe <strong>in</strong>terconnector is not already fully utilized for import.The <strong>in</strong>terconnections to Russia and the other Baltic States have been not considered<strong>in</strong> the analyses, as Eler<strong>in</strong>g considers them <strong>in</strong>flexible and unavailable toprovide regulat<strong>in</strong>g capacity <strong>in</strong> times of emergency (apart from exist<strong>in</strong>g agreementsto deal with n-1 situations). However future agreements could augmenttheir role <strong>in</strong> reserve plann<strong>in</strong>g.900 MW <strong>in</strong> 2013In Figure 12, the load follow<strong>in</strong>g capacity reserves identified by the 3σ methodare deducted from the BALMOREL leftover capacity that can be ramped upwith<strong>in</strong> at most one hour.33 | <strong>W<strong>in</strong>d</strong> <strong>Power</strong> <strong>in</strong> <strong>Estonia</strong>, 13-05-2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!