10.07.2015 Views

Gigaset N720 DECT IP Multicell System

Gigaset N720 DECT IP Multicell System

Gigaset N720 DECT IP Multicell System

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Working with the <strong>Gigaset</strong> <strong>N720</strong> SPK PRO¤ Insert the battery pack into the batterycompartment in the base carrier §§3§§.¤ Slide the lid onto the battery compartment§§4§§ until it clicks into place.43Charging the batteriesThe measuring base station is connectedto the power supply by means ofa cable §§1§§.The charging socket is located behindopening §§2§§, while there is a switch forswitching between "Operation" and"Charge" behind opening §§3§§.¤ Move the switch to the chargingposition by sliding it towards thecharging socket.132¤ Plug the battery charger into a mainssocket §§4§§.You may need to attach the appropriateplug-in module first.¤ Plug the battery charger plug intothe charging socket on the back ofthe base carrier §§5§§.¤ Charge the batteries until thecharger's charging indicator lights up.¤ When the batteries are charged,unplug the charger plug from thecharging socket and return theswitch to the "Operation" position.5432Vo<strong>IP</strong>on www.voipon.co.uk sales@voipon.co.uk Tel: +44 (0)1245 808195 Fax: +44 (0)1245 808299

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!