11.07.2015 Views

public health engineering department - Assam Online Portal

public health engineering department - Assam Online Portal

public health engineering department - Assam Online Portal

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

As-Is and e-Readiness Study report on Public Health EngineeringDepartment, Govt. of <strong>Assam</strong>(vii) shifting the role of Government from direct service delivery to that of planning, policyformulation, monitoring and evaluation, and partial financial support.3.2 Swajaldhara will have two Dharas (streams). First Dhara (Swajaldhara I) will be for aGram Panchayat (GP) or a group of GPs or an intermediate Panchayat (at Block / Tehsillevel) and the Second Dhara (Swajaldhara II) will have a District as the Project area.Swajaldhara - I3.3 States can implement Swajaldhara in Blocks / Gram Panchayats in the districts outsidethe Swajaldhara II project districts. In such cases all the fundamental reform principles areto be followed in those areas. Thus, the lowest unit for implementing the reform initiativeunder Swajaldhara –I would be a Gram Panchayat. A group of Gram Panchayats or theIntermediate Panchayat could also come up with project proposals. Swajaldhara –I beingprimarily for a Gram Panchayat should normally have small drinking water schemes. Multi-Gram Panchayat schemes, while not prohibited, would require specific and preciseformulation of capital cost sharing, operation and maintenance arrangements and costcollection mechanisms.3.4 Specific proposals under Swajaldhara - I will be sanctioned by the District Water andSanitation Committee (DWSC) provided the projects conform to the Guidelines ofSwajaldhara.3.5 If more than 50% of Blocks/Gram Panchayats in any particular District opt for rural watersupply schemes under Swajaldhara –I, the StateGovernment could consider posing / taking up the entire District under Swajaldhara –II tothe State Water and Sanitation Mission (SWSM).Swajaldhara - II3.6 The District is the unit for implementing the reform initiative under Swajaldhara – II.The State Governments would identify districts where chances of success of Swajaldharaare high and prepare proposals for implementation of Swajaldhara II. Such requests shouldhave project proposal along with Project Implementation Plan (PIP) and Detailed ProjectReport (DPR). The District selection under Swajaldhara –II will be made by the State Waterand Sanitation Mission (SWSM) in all States / Union Territories.PROJECT ACTIVITIES1 During project preparation, a detailed project implementation schedule would bedeveloped. The projects under Swajaldhara would follow a scheme cycle of about 36months consisting of four distinct phases and a post project completion phase. Sincemostly small schemes are likely to be taken up in a single Gram Panchayat underSwajaldhara –I, the duration of scheme cycle could be between 12-18 months. It may,Ref.: AEDC/AOP/EOI/2009/10 Copyright : AEDC Ltd. 31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!