11.07.2015 Views

public health engineering department - Assam Online Portal

public health engineering department - Assam Online Portal

public health engineering department - Assam Online Portal

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

As-Is and e-Readiness Study report on Public Health EngineeringDepartment, Govt. of <strong>Assam</strong>(b) Whether adequate ground water, surface water and roof-water is available during theplanned months(c) Whether water demand and budgeting is done during different seasons of the year andif so, details thereof(d) What is the catchment protection works conducted for contamination control in drinkingwater sources(e) Quality of drinking water in each of the drinking water sources selected.(f) Whether alternate safe drinking water supply is provided by the State implementingagency. If so, per-capita supply level and quality of water supplied?(g) Current status of water borne and water based diseases prevalent?(h) What is the community initiative taken up to take care of the system properly?(i) % of households having safe sanitation facilities and using them(j) What type of solid and liquid waste management adopted ?(k) Whether the ground water level is monitored if so, specify the frequency of monitoringand whether any log book is maintained to record the measurements(l) Whether the Panchayat is using FTK provided by the State implementing agency? If so,% of water samples tested positive for contamination and referred to +2/degree college/district water testing laboratory/PH laboratory/ any other private laboratory during thelast one year?(m) How many such samples (in %) were confirmed positive by the district water testing orany other laboratory during the last 3 years ?(n) What remedial action is taken in such cases ?(o) Whether any solar/bio-gas/biomass/bio-fuel/wind or any other new and renewableenergy systems are being used in drinking water supply system ?(p) Whether traditional wells/ponds have been repaired/ renovated? If so, involvement ofcommunity may be explained(q) Whether any water tariff plan is being levied for collection of water charges. If so, % ofexpenses being recovered and use of XII Finance Commission funds for O&M of watersupply systems(r) Whether any convergence activity occurred in polling up funds from NREGA, DDP,DPAP, Dug-well recharge scheme or any other Central/State schemes?(s) Whether the GP has achieved Nirmal Gram Puraskar ? If so, specify the year.Ref.: AEDC/AOP/EOI/2009/10 Copyright : AEDC Ltd. 49

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!