- Page 1 and 2:
●INTERNATIONAL ASSOCIATION OF GEO
- Page 3 and 4:
TABLE OF CONTENTS.FINAL AGENDA . .
- Page 5 and 6:
13:30 NGS14:00 S1014:30 EMR15:00 CO
- Page 7 and 8:
LIST OF PARTICIPANTS:Prof. Gerhard
- Page 10 and 11:
Table 1. Current IGS Analysis Cente
- Page 12 and 13:
The first field identifies the reco
- Page 14 and 15:
Summary InformationThe third produc
- Page 16 and 17:
From Figure 1 we find that there ar
- Page 18:
to define a reference clock in thei
- Page 22 and 23:
SESSION 2(IGS orbit products)
- Page 24 and 25:
1. introductionThe main objectives
- Page 26 and 27:
ecause of the above averaging. This
- Page 28 and 29:
RMS per center (m)o 0 0 0 0 0 oA0Iv
- Page 30:
Scale (ppb)I I I I I 11+-b~ul0Amo&I
- Page 33 and 34:
and NGS. Note that the day to day v
- Page 35 and 36:
Rotation around X-axis (mas)1&0 0o
- Page 37 and 38:
discussed in Section 3 are here see
- Page 39 and 40:
-----------------------------------
- Page 41 and 42:
Residuals in Meters1 1 1 1 1 1 1=%m
- Page 43 and 44:
Residuals inMeters11111cnficJJw-o A
- Page 45 and 46:
I I I—Residuals in Meters..—.
- Page 47 and 48:
1111ResidualsMeters,—{44
- Page 49 and 50:
Residuals in MetersI I I II I I IIc
- Page 51 and 52:
Rms in MetersI 1 ! I 1 10 n0 a0n.ff
- Page 53 and 54:
IGS- and the COM-sets, but that the
- Page 55 and 56:
Table 4.1 N.A. Baseline Repeatabili
- Page 57 and 58:
..Figure 5.1:Clock solutions for FA
- Page 59 and 60:
specifically the preanalysis can be
- Page 61 and 62:
discussion, a question as to whethe
- Page 63 and 64:
SUMMARY OF SESSION 3This Session be
- Page 65 and 66: IGS POSITION PAPER, IGS ANALYSIS CE
- Page 67 and 68: and Earth orientation parameters (E
- Page 69 and 70: LbPIERS and IGSCentral Bureausand D
- Page 71 and 72: @ IGS will develop instructions, an
- Page 73: 2.2 Analysis Center System DesignFi
- Page 76 and 77: applied to the solution in order to
- Page 78 and 79: ..standard deviations. This is conv
- Page 80 and 81: known, the two solutions will be ad
- Page 82 and 83: errors, and can therefore be used a
- Page 84 and 85: International Terrestrial Reference
- Page 86 and 87: Thus, there is the potential of fee
- Page 88 and 89: 90” 100” 110” 120” 130” 1
- Page 91 and 92: adiation parameters for each satell
- Page 93 and 94: Bock, Y., R.I. Abbot, C.C. Counselm
- Page 95 and 96: SUMMARY OF SESSION 4This session st
- Page 97 and 98: INTERNATIONAL EARTH ROTATION SERVIC
- Page 99 and 100: x- differences with IERS0.001”I I
- Page 101 and 102: SUMMARY OF SESSION 5In the last ses
- Page 103 and 104: 1) I(X3 PROCESSING/REPORTS/FORMATSS
- Page 105 and 106: IGS should foster and encourage reg
- Page 107 and 108: ..INTERNATIONAL GPS SERVICE FORGEOD
- Page 109 and 110: ortL.s.4
- Page 111 and 112: 1234567a91011121314IsIt17ItIs2C2122
- Page 113 and 114: . Ruth Neilan16S Central BureauJet
- Page 115: ON1T.>● Jim ZumbergeJet Propulsio