11.07.2015 Views

PMA209 2012 Core Avionics Master Plan - NAVAIR - U.S. Navy

PMA209 2012 Core Avionics Master Plan - NAVAIR - U.S. Navy

PMA209 2012 Core Avionics Master Plan - NAVAIR - U.S. Navy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Core</strong> <strong>Avionics</strong> <strong>Master</strong> <strong>Plan</strong>Platform NARG and OAG attendees review the Enabler NARG recommendedpriority lists at their platform events and formally report concurrence or changes to therecommendations. Each Enabler NARG ESC then collates the Platform NARG andOAG responses and builds a collective (Enterprise-perspective) priority list that ispresented to the TYCOM Priority Panel (TPP). The TPP uses those lists to generate theTYCOM Priority List (TPL), which is used to influence the Aviation Sponsor’s ProgramProposal (SPP) budget build. Marine Corps Platform OAG results are also provided tothe Headquarters Marine Corps (HQMC) Aviation Weapons Systems RequirementsBranch (APW) Council of Colonels, which prioritizes issues for budget consideration.Platform community leaders are strongly encouraged to send experiencedoperators who are familiar with their mission sets to the Enabler NARG events. Whenpossible, it is best if these same personnel are available to carry what they learn at theEnabler NARG event to the Platform NARG or OAG event. This allows avionics-enabledcapability growth to be championed by a community member, rather than thecommodity system managers. Except for safety systems, which are mandated byOPNAV and DoD instructions, there are no formal requirements to field avionicssystems per se. The requirement comes in the form of the operational missioncontribution that a platform performs with the capability enabled by the avionics.Therefore, all requirements for avionics must be sponsored by Fleet (platform) users.The Enabler NARG process provides a vehicle to align that sponsorship.Dec - Feb Mar - Jun Jul - Aug Aug - Oct Dec - JanCommon<strong>Avionics</strong>EnablerNARGUSNPlatformNARGTop 5PlatformIssuesCNAFN8CNAFTYCOMPriority PanelCNAFTYCOMPriority ListRecommended<strong>Avionics</strong> Priority ListsPlatformTop 5<strong>Avionics</strong>Issues<strong>Avionics</strong>ESCTop 5 Fleet<strong>Avionics</strong>IssuesOPNAVN98 PRRBriefsN98Rack &StackFlag LevelInvestmentPrioritiesConferenceFleetFeedUSMCPlatformOAGTop 5PlatformIssuesHQMCAPWAPWCouncil ofColonelsDCARack &StackAviationSponsor’sProgramProposalCommon<strong>Avionics</strong>USN PlatformUSMC PlatformAcquisitionAlignment<strong>PMA209</strong> ACEPlatform PMAsCommon &Platform ROsAcquisition FeedACE = Air Combat ElectronicsNARG = Naval Aviation Reqts GroupOAG = Operational Advisory GroupESC = Executive Steering CommitteeCNAF = Commander Naval Air ForcesOPNAV = CNO OfficesDCA = Deputy Commandant AviationAPW = HQ USMC Aviation Pgms WepsPRR = Program Requirement ReviewsFLIP = Flag Level Investment PrioritiesSPP = Sponsor’s Program Proposal<strong>Core</strong> <strong>Avionics</strong> Issue Capture Process.<strong>Core</strong> Section CAMP <strong>2012</strong> 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!