11.07.2015 Views

DC Genset / Watermaker Manual - Balmar

DC Genset / Watermaker Manual - Balmar

DC Genset / Watermaker Manual - Balmar

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Watermaker</strong> SpecificationsFeed-water pH Range: 3-11Feed-water Temperature Range: 40° to 100°F (4.4°C to 37.8°C)Membrane Salt Rejection: 98.6 % or greaterMaximum Operating Pressure: 800 PSICpm Switched Accessory Terminal Output: 6 Amps @ 12 V<strong>DC</strong>High Pressure Pump Crankcase Lubricant: <strong>Balmar</strong> P/N 334-010High Pressure Pump Crankcase Capacity: 12 oz*All performance specifications are with feed-water salinity of 35,000 PPM, feed-water pH of 8, feed-watertemperature of 77°F (25°C), and operating pressure of 800 PSI. Product water output will decrease with lower feedwatertemperatures. Rated output at a given temperature is +/- 15%.Replacement PartsGenuine <strong>Balmar</strong> replacement parts as well as modules and accessories are available fromauthorized <strong>Balmar</strong> dealers. As a convenience to <strong>Balmar</strong> product users, replacement partsare also available directly from <strong>Balmar</strong> Products.WARNING: Use of other than genuine <strong>Balmar</strong> replacement parts may impair theperformance and/or inherent safety of the system and may also void the warranty.Replacement parts obtained from dealers are not necessarily genuine.Desalinator OperationInitial <strong>Watermaker</strong> StartupNOTE: If there is a chance that the ROM will be subjected to freezing temperatures duringthe lay-up, remove the high pressure vessel, seal the vessel ports with the caps suppliedin the Cleaning/Biocide Kit, and place the vessel in a storage location whose temperaturewill be maintained between 50°F (10°C) and 75 °F (24°C). A food grade preservative isavailable from <strong>Balmar</strong>, should removal be difficult. This acts as an appropriate anti freeze.But it is not rated below 20 F.CAUTION: Allowing the membrane to freeze will cause permanent damage.The following procedure should be used for new installations and for returning systemsto service after a prolonged shutdown.1. De-energize the Desalinator circuit breaker. Ensure that there are no explosivevapors present in any of the compartments where components of the Desalinatorare located. (This step is primarily for installation in hazardous locations such asoffshore oil platforms and gasoline powered boats.)2. Ensure that the high-pressure pump crankcase is filled to the red dot on the oillevel indicator.3. Set the Product Water Control valve to normal.4. Open all feed-water inlets.- 12 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!