11.07.2015 Views

DI8xz

DI8xz

DI8xz

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 5: Capex and Opex Savings for Different NetworkDeployment ModelsChapter 6Capex savingsOpex savingsOrder ofsavings(to be scaledwith reachof sharing)Site sharing• Site acquisitioncosts• Site preparationcosts (civil works,tower/pole, room/container)• Site rental costs• Site administrationcosts• Basic sitemaintenance costs(tower checks,cleaning etc.)~10%Infrastructuresharing• Above, and...• Infrastructurecosts (power,aircon, alarms,antennas,feeders)• Electricity costs(aircon etc.)• Further sitemaintenance costs(infrastructure)~16-20%Telcoequipmentsharing• Above, and...• Telco equipmentcosts (cabinets,transmissionequipment,TRAUs/BSCs)• Opimization costs• Electricity costs(telco equipment)• Maintenance costs(telco equipment)• Transmission costs• Operation costs~25%Nationalroaming• Above, and...• Further telcoequipment costs(cabinets, TRXs,TRAUs/BSCs)• Opimization costs• Electricity costs(telco equipment)• Maintenance costs(telco equipment)• Operations costs• Possibly radiolicence costs~30%Full sharing• Above, and...• Further telcoequipment costs(core network,core transmisionnetwork)• Related rental,electricity,Maintenance costs• Operation costs~40%Source: IADB/World Bank.77

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!