11.07.2015 Views

safety in railway tunnels - ERA

safety in railway tunnels - ERA

safety in railway tunnels - ERA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(4) The lay-out of the fire fight<strong>in</strong>g po<strong>in</strong>t and its equipment shall take <strong>in</strong>to account the control ofsmoke, <strong>in</strong> particular to protect people who use the self-evacuation facilities to access the safearea.4.2.1.8 Emergency communicationThis specification applies to all <strong>tunnels</strong> of more than 1 km <strong>in</strong> length.(a) Radio communication between the tra<strong>in</strong> and the <strong>in</strong>frastructure manager control centre shall beprovided <strong>in</strong> each tunnel with GSM-R.(b) Radio cont<strong>in</strong>uity shall be provided for permitt<strong>in</strong>g the emergency response services to communicatewith their on-site command facilities. The system shall allow the emergency response services to usetheir own communication equipment.4.2.2. Subsystem EnergyThis section applies to the <strong>in</strong>frastructure part of the subsystem Energy.4.2.2.1. Segmentation of overhead l<strong>in</strong>e or conductor railsThis specification applies to <strong>tunnels</strong> of more than 5 km <strong>in</strong> length.(a) The traction energy supply system <strong>in</strong> <strong>tunnels</strong> shall be divided up <strong>in</strong>to sections, each not exceed<strong>in</strong>g 5km. This specification applies only if the signall<strong>in</strong>g system permits the presence of more than one tra<strong>in</strong> <strong>in</strong>the tunnel on each track simultaneously.(b) The location of the switches shall be arranged so that the number of switches <strong>in</strong> the tunnel ism<strong>in</strong>imised.(c) Remote control and switch<strong>in</strong>g of each ‘switch<strong>in</strong>g section’ shall be provided.(d) A means of communication and light<strong>in</strong>g shall be provided at the switch<strong>in</strong>g location to enable safemanual operation and ma<strong>in</strong>tenance of the switch<strong>in</strong>g equipment.4.2.2.2. Overhead l<strong>in</strong>e or conductor rail earth<strong>in</strong>gThis specification applies to all <strong>tunnels</strong> of more than 1 km length.(a) Earth<strong>in</strong>g devices shall be provided at tunnel access po<strong>in</strong>ts and, if the earth<strong>in</strong>g procedures allow theearth<strong>in</strong>g of a s<strong>in</strong>gle section, close to the separation po<strong>in</strong>ts between sections. These shall be eithermanually or remotely controlled fixed <strong>in</strong>stallations.(b) Communication and light<strong>in</strong>g means necessary for earth<strong>in</strong>g operations shall be provided.(c) Procedures and responsibilities for earth<strong>in</strong>g shall be def<strong>in</strong>ed between the Infrastructure Managerand the emergency response services, based on the emergency scenarios considered with<strong>in</strong> theemergency plan.21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!