11.07.2015 Views

safety in railway tunnels - ERA

safety in railway tunnels - ERA

safety in railway tunnels - ERA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(c) In case the analysis results <strong>in</strong> a favourable op<strong>in</strong>ion, the appropriate functional and <strong>in</strong>terfacespecifications as well as the assessment method which are necessary to be <strong>in</strong>cluded <strong>in</strong> the TSI <strong>in</strong> orderto allow the use of this constituent will be developed.(d) The appropriate functional and <strong>in</strong>terface specifications and the assessment methods so producedshall be <strong>in</strong>corporated <strong>in</strong> the TSI by the revision process. By a decision taken <strong>in</strong> accordance with Article 29of Directive 2008/57/EC, the <strong>in</strong>novative solution may be permitted to be used before the revised TSI is <strong>in</strong>force.6.2.5. Assessment of ma<strong>in</strong>tenance(a) Accord<strong>in</strong>g to Article 18 (3) of Directive 2008/57/EC, a notified body shall be responsible for compil<strong>in</strong>gthe technical file, conta<strong>in</strong><strong>in</strong>g the documentation requested for operation and ma<strong>in</strong>tenance.(b) The notified body shall verify only that the documentation requested for operation andma<strong>in</strong>tenance, as def<strong>in</strong>ed <strong>in</strong> clause 4.5 of this TSI, is provided. The notified body is not required to verifythe <strong>in</strong>formation conta<strong>in</strong>ed <strong>in</strong> the documentation provided.6.2.6. Assessment of operational rules(a) In conformity with Articles 10 and 11 of Directive 2004/49EC, Railway Undertak<strong>in</strong>gs andInfrastructure Managers shall demonstrate compliance with the requirements of this TSI with<strong>in</strong> their<strong>safety</strong> management system when apply<strong>in</strong>g for any new or amended <strong>safety</strong> certificate or <strong>safety</strong>authorisation. Compliance with operation rules of this TSI does not require assessment by a NotifiedBody.6.2.7. Additional requirements for assessment of specifications concern<strong>in</strong>g the IM6.2.7.1. Prevent unauthorised access to emergency exits and equipment roomsThe assessment shall confirm that:(a) Emergency exit doors to the surface and doors to technical rooms are provided with suitable locks(b) The locks provided are consistent with the overall strategy for security for the tunnel and adjacent<strong>in</strong>frastructure(c) Emergency exits are not lockable from the <strong>in</strong>side and shall be able to be opened by evacuat<strong>in</strong>gpersons(d) Access arrangements are <strong>in</strong> place for the emergency response services6.2.7.2. Fire resistance of tunnel structures(a) The Notified Body shall assess conformity with the fire protection requirements for structures,def<strong>in</strong>ed <strong>in</strong> 4.2.1.2, by us<strong>in</strong>g the results of calculations and/or tests made by the applicant, or by anequivalent method.31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!