11.07.2015 Views

safety in railway tunnels - ERA

safety in railway tunnels - ERA

safety in railway tunnels - ERA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(b) If not def<strong>in</strong>ed otherwise <strong>in</strong> section 7.3 ‘Specific Cases’, all new TSI compliant category B roll<strong>in</strong>g stockis deemed to achieve a higher fire and tunnel <strong>safety</strong> level than non-TSI compliant roll<strong>in</strong>g stock. Thisassumption is used to justify the safe operation of new TSI-compliant roll<strong>in</strong>g stock <strong>in</strong> old non-TSIcompliant <strong>tunnels</strong>. Therefore, all TSI compliant category B tra<strong>in</strong>s are deemed to be suitable for the safe<strong>in</strong>tegration <strong>in</strong> accordance with Article 15(1) of Directive 2008/57/EC with all non-TSI compliant <strong>tunnels</strong>with<strong>in</strong> the geographical scope of this TSI.(c) Notwithstand<strong>in</strong>g the above, measures over and above those set out <strong>in</strong> this TSI may be necessary toachieve the desired tunnel <strong>safety</strong> level. Such measures may only be imposed on the subsystemsInfrastructure, Energy and Operations and shall not restrict the authorisation or use of TSI compliantroll<strong>in</strong>g stock.7.1. Application of this TSI to new subsystems7.1.1. General(a) This TSI is applicable to all subsystems <strong>in</strong> its scope which are placed <strong>in</strong>to service after the date ofapplication of this TSI, except when def<strong>in</strong>ed otherwise <strong>in</strong> the sections below.(b) The application of this TSI to On-track mach<strong>in</strong>es is voluntary. Where on-track mach<strong>in</strong>es are notassessed and declared to be <strong>in</strong> conformity with this TSI, it shall be subject to national rules. In the lattercase Articles 24 and 25 of Directive 2008/57/EC apply.7.1.2. New roll<strong>in</strong>g stock(a) For new roll<strong>in</strong>g stock, the implementation rules as set out <strong>in</strong> the clause 7.1.1 of the LOC&PAS TSI shallbe applied.7.1.3 New Infrastructure(a) This TSI is applicable to all new Infrastructure <strong>in</strong> its scope.7.2. Application of this TSI to subsystems already <strong>in</strong> service7.2.1. Upgrade or renewal of roll<strong>in</strong>g stock(a) In case of renewal or upgrade of exist<strong>in</strong>g roll<strong>in</strong>g stock, the LOC&PAS TSI shall be applied.7.2.2. Upgrade and renewal measures for <strong>tunnels</strong>(a) Tak<strong>in</strong>g <strong>in</strong>to consideration Directive 2008/57/EC, Article 20(1), any modification of the basicparameters of the structural subsystems as set out <strong>in</strong> this TSI is deemed to affect the overall <strong>safety</strong> levelof the <strong>in</strong>frastructure subsystem concerned. Therefore, Member States shall decide to which extend thisTSI needs to be applied to the project. If not def<strong>in</strong>ed otherwise <strong>in</strong> section 7.3 ‘Specific Cases’, the resultof renewal or upgrade works shall ensure that compatibility of the fixed <strong>in</strong>stallations with TSI compliantroll<strong>in</strong>g stock is ma<strong>in</strong>ta<strong>in</strong>ed or improved.7.2.3. Operations subsystem(a) Operational aspects and their implementation are set out <strong>in</strong> the OPE TSI.33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!