11.07.2015 Views

Slide (460 kb) - Met Office

Slide (460 kb) - Met Office

Slide (460 kb) - Met Office

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Ensemble Upgrades• Some key ensemble plans will advance PoP:• Vertical localisation• Better control of perturbations at different levels• Stratosphere to prevent instability• Boundary layer for improved spread in weatherparameters• Surface perturbations• Ensembles with convection-allowing model (1.5km)• Resolved convection• Improved topographic forcing© Crown copyright <strong>Met</strong> <strong>Office</strong> MOSAC Paper 13.9, 14 Nov 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!