27.11.2012 Views

Efficient Vans: A Best Practice Guide to Cost - Transport Cafe

Efficient Vans: A Best Practice Guide to Cost - Transport Cafe

Efficient Vans: A Best Practice Guide to Cost - Transport Cafe

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Efficient</strong> <strong>Vans</strong>: A <strong>Best</strong> <strong>Practice</strong> <strong>Guide</strong> <strong>to</strong> <strong>Cost</strong>-effective Van Use<br />

16<br />

It is important that changes are<br />

ambitious but attainable and <strong>to</strong><br />

think of timescales by which you<br />

want <strong>to</strong> bring about these changes.<br />

Concentrate on two or three major<br />

areas initially where progress is likely<br />

<strong>to</strong> be made given your particular<br />

circumstances. Focusing on these<br />

areas, you can then refer <strong>to</strong><br />

section 5 of this document that<br />

highlights methods that could be<br />

put in place <strong>to</strong> address these areas.<br />

Further details on each of these and<br />

the associated implications are also<br />

provided.<br />

4.4<br />

Implement: Making the Change<br />

A table such as Table 4.1 could<br />

provide a useful method for<br />

communicating problems and<br />

priorities <strong>to</strong> your business.<br />

Communication of the initial ideas<br />

<strong>to</strong> those employees likely <strong>to</strong> be<br />

involved is important for strategies<br />

<strong>to</strong> get approval and <strong>to</strong> help increase<br />

co-operation.<br />

An action plan will only work if it is<br />

given time <strong>to</strong> be considered. This<br />

involves planning changes carefully<br />

and discussing them with all<br />

relevant areas of the business. From<br />

the known starting points and the<br />

arrangements <strong>to</strong> measure progress,<br />

you should establish key points<br />

for targets and enforce completion<br />

dates. This will allow you <strong>to</strong> keep<br />

on track with your progress and <strong>to</strong><br />

make sure it does not slip. Having<br />

time-bound actions will provide<br />

additional motivation for ensuring<br />

progress is made.<br />

Indica<strong>to</strong>rs are measurements that<br />

can be used <strong>to</strong> show the progress or<br />

state of an activity or project. There<br />

are a range of different indica<strong>to</strong>rs<br />

that can be used <strong>to</strong> represent your<br />

needs. A range of indica<strong>to</strong>rs will be<br />

required <strong>to</strong> show the change and<br />

improvement achieved in all areas<br />

of the business. For some aspects<br />

of your van operation, it may be<br />

necessary <strong>to</strong> have more than one<br />

indica<strong>to</strong>r. Indica<strong>to</strong>rs could include<br />

information on vehicle usage, fuel<br />

costs and vehicle performance.