11.07.2015 Views

Request for Proposal RFP - tripura state co-operative bank

Request for Proposal RFP - tripura state co-operative bank

Request for Proposal RFP - tripura state co-operative bank

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>RFP</strong> <strong>for</strong> TSCB Core Banking ProjectTender #:site visits, as part of the final evaluation in ac<strong>co</strong>rdance with the responsesgiven <strong>for</strong> the identified requirements, any time after the last date <strong>for</strong>submissions of bids. The Bank will <strong>co</strong>mmunicate a date and time to allqualified vendors any time after the last date <strong>for</strong> submission of bids.3.1.4.13 Right to Alter Quantities – The Bank reserve the right to alter therequirements specified in the tender. The Bank also reserves the right todelete one or more items from the list of items specified in the tender. TheBank will in<strong>for</strong>m all vendors about changes, if any.3.1.4.14 Details of Sub-<strong>co</strong>ntracts, as applicable – If required by the Bank, Vendorsshould provide <strong>co</strong>mplete details of any sub<strong>co</strong>ntractor/s used <strong>for</strong> thepurpose of this engagement. It is clarified that notwithstanding the use ofsub <strong>co</strong>ntractors by the Vendor, the Vendor shall be solely responsible <strong>for</strong>per<strong>for</strong>mance of all obligations under the <strong>RFP</strong> irrespective of the failure orinability of the sub<strong>co</strong>ntractor chosen by the Vendor to per<strong>for</strong>m itsobligations. The Vendor shall also have the responsibility <strong>for</strong> payment of alldues and <strong>co</strong>ntributions, as applicable, towards statutory benefits <strong>for</strong> itsemployees and of sub-<strong>co</strong>ntractors.3.1.4.15 If the Bank are not satisfied with the technical specifications in any tenderand observes major deviations, the technical bids of such vendors may notbe short-listed and the price bids of such vendors may not be opened. Nofurther discussions shall be entertained with such vendors in respect of thesubject technical bid.3.1.4.16 Vendor shall in<strong>for</strong>m their readiness <strong>for</strong> the pre-delivery inspection at least15 days in advance. For the network <strong>co</strong>mponents and other hardwareinfrastructure, the same will be tested by the Bank on a sample or 100%basis at vendor’s site or Banks premises. All reasonable facilities, tools andassistance including access to drawings and production data should beprovided to the Banks officials and the <strong>co</strong>nsultants during inspection. Thereshall not be any additional charges <strong>for</strong> such inspection. However, Banks willhave the discretion to re<strong>co</strong>ver the <strong>co</strong>sts related to travel and stay of itsstaff / <strong>co</strong>nsultants if the equipment offered <strong>for</strong> inspection is not as perBanks’ requirement or the test <strong>co</strong>nditions are not <strong>co</strong>mplied with. It isexpected that the equipment should be ready <strong>for</strong> inspection within twomonths from the date of awarding the <strong>co</strong>ntract by the Bank. If the Vendorfails to intimate the date of inspection within 45 days of date of awardingthe <strong>co</strong>ntract by the Bank, it will be treated as a breach of <strong>co</strong>ntract and theBank reserves the right to levy penalty, as specified in Section 3.2.18.3.1.4.17 No site will be accepted as <strong>co</strong>mplete if any part of hardware, software,network <strong>co</strong>mponents etc. are not delivered, and if delivered not installed,and operationalised free of any additional <strong>co</strong>st to the Bank. In such anevent, the supply and installation will be termed in<strong>co</strong>mplete and will not beaccepted and warranty period will not <strong>co</strong>mmence, besides Bank right toinvoke the penalties which will be prescribed in the <strong>co</strong>ntract. Every site willbe accepted after <strong>co</strong>mplete <strong>co</strong>mmissioning of equipment & functioning ofequipment <strong>for</strong> a minimum period of ten (10) days. The manufacturer'scertification <strong>for</strong> structured cabling should be submitted <strong>for</strong> the Data centre& Disaster Re<strong>co</strong>very site within a period of one month from the date ofacceptance of the DC. The payment towards network equipment will bereleased only on production of the manufacturer's certificate.3.1.4.18 There will be an acceptance test by the Bank or its nominated <strong>co</strong>nsultantsafter installation of the systems. In case of discrepancy in hardware /software supplied, the Bank reserve the right to cancel the entire purchaseStrictly Confidential Main Document Page 40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!