11.07.2015 Views

Request for Proposal RFP - tripura state co-operative bank

Request for Proposal RFP - tripura state co-operative bank

Request for Proposal RFP - tripura state co-operative bank

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>RFP</strong> <strong>for</strong> TSCB Core Banking ProjectTender #:3.2.5.1.6.1 The <strong>co</strong>st of customisation <strong>for</strong> items marked as “3” would be payable onsuccessful implementation and Bank sign off of all the items marked as“3”;3.2.5.1.6.2 The <strong>co</strong>st of customisation <strong>for</strong> items marked as “2” would be payable onsuccessful implementation and Bank sign off of all the items marked as“2”; and3.2.5.1.6.3 The <strong>co</strong>st of customisation <strong>for</strong> items marked as “1” would be payable onsuccessful implementation and Bank sign off of all the items marked as“1”.3.2.5.1.6.4 The <strong>co</strong>st of customisation <strong>for</strong> items marked as “0” would be payable onsuccessful implementation and Bank sign off of all the items marked as“0”.Items marked as "3","2","1","0" refer to items in Appendix 1 -Functional <strong>RFP</strong>.3.2.5.1.6.5 The <strong>co</strong>st of customisation of gaps identified during productdemonstration, current <strong>state</strong> study, training, functional requirementsspecifications study, system testing, user acceptance testing, businessprocess reengineering and pilot branch implementation should beincluded by the Vendor as Implementation <strong>co</strong>sts. The Bank will not paythe Vendor any additional charges at a later date <strong>for</strong> all suchcustomisations.3.2.5.1.6.6 The Vendor shall take up all such functionality as required by the Bankon a priority basis even though the Vendor is suppose to provide <strong>for</strong> thesame at a later date as per its response in the Appendix 1 and till suchtime the functionality is not provided <strong>for</strong> the Vendor will suggest asuitable workaround <strong>for</strong> the same. The Bank will not pay the Vendor anyadditional charges <strong>for</strong> such customisation requests.The workaround provided by the vendor may be acceptable to the Bankas a temporary solution but the Bank may still insist on a particularfunctionality to be made available as a regular feature of the software inwhich case the Bank shall decide the priority.3.2.5.1.7 Implementation <strong>co</strong>st <strong>for</strong> CBS:3.2.5.1.7.1 10 % of the Contract amount, <strong>for</strong> pilot implementation, would bepayable on successful <strong>co</strong>mpletion of current <strong>state</strong> assessment, gapanalysis and systems specifications definition phase or on <strong>co</strong>mpletion of1 month from the date of placing the order, whichever is later;3.2.5.1.7.2 15 % of the <strong>co</strong>ntract amount, <strong>for</strong> pilot implementation, would bepayable on successful <strong>co</strong>mpletion of the customisation and testing phaseor on <strong>co</strong>mpletion of 2 months from the date of placing the order,whichever is later;3.2.5.1.7.3 50 % of the <strong>co</strong>ntract amount, <strong>for</strong> pilot implementation, would bepayable on successful implementation of the applications in each of the8 pilot branches; and3.2.5.1.7.4 The balance 25 % of the <strong>co</strong>ntract amount, <strong>for</strong> pilot implementation,would be payable on <strong>co</strong>mpletion of 3 months from the date of successfulimplementation of the applications in each of the 8 pilot branches.3.2.5.1.7.5 Implementation <strong>co</strong>st <strong>for</strong> every additional branch beyond the pilot, wouldbe payable monthly at the end of the month <strong>for</strong> all the branchesStrictly Confidential Main Document Page 49

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!