12.07.2015 Views

Modena HE 18s, 25s & 32s - Ferroli

Modena HE 18s, 25s & 32s - Ferroli

Modena HE 18s, 25s & 32s - Ferroli

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MODENA S <strong>HE</strong>Shutoff valve kitThe shutoff valves supplied (see fig. 10) must be installed between the boiler and heating system to allow the boiler tobe isolated from the system if necessary.For installation, follow the instructions contained in the kit.A Delivery cock 3/4” (Red)C Gas cock 1/2” (yellow)F System return cock 3/4” - System fillingACFMake up waterfig. 10 - Shutoff valve kitProvision must be made for replacing water lost from the sealed system. Reference should be made to BS6798, formethods of filling and making up sealed systems. There must be no direct connection between the boiler's central heatingsystem and the mains water supply. The use of mains water to charge and pressurise the system directly, is conditionalupon the Local Water Byelaws. Again any such connection must be disconnected after use. Ensure the fillingpoint is on the return pipe to the boiler.Attention - is drawn to the Model Water Byelaws.Key1. C.H. filling valve2. Temporary connection3. Cold water supply valve4. Double check valvefig. 11 - Filling systemENcod. 3541C364 - Rev. 00 - 12/20129

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!