12.07.2015 Views

tankers calling at fujairah spm terminals - Port Of Fujairah

tankers calling at fujairah spm terminals - Port Of Fujairah

tankers calling at fujairah spm terminals - Port Of Fujairah

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

It is the responsibility of Pilot and SPM terminal LM to check the goodworking order of the communic<strong>at</strong>ions network prior to commencementof loading oper<strong>at</strong>ions and on an hourly basis thereafter.SPM terminal is responsible to ensure good communic<strong>at</strong>ions betweenits LMs and SPM terminal CR and SPM terminal LM is responsible tocease loading and emergency shutdown of pumps.7. Emergency shutdown during Cargo Oper<strong>at</strong>ion.An Emergency Shutdown procedure should be agreed between the tankerMaster and the SPM Terminal Control Room. The possible dangersassoci<strong>at</strong>ed with any emergency shutdown procedure should beacknowledged.Shut down communic<strong>at</strong>ion will be through U.H.F Channel as per belowtable,SPM’s TerminalVOPAK SPM “A”IPIC - SPM 1 “B”IPIC - SPM 2 “C”IPIC - SPM 3 “E”FAPCO SPM “J”Frequencies430.2375 MHZ404.4625 MHZ404.5125 MHZ430.6125 MHZ432.5125 MHZVersion No. 2 / D<strong>at</strong>e : 01.04.2012 Revision No. 7/ 30.01.2013 Page 37 |6 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!