Synchronous servomotors DBL/DBK - BIBUS SK, sro
Synchronous servomotors DBL/DBK - BIBUS SK, sro
Synchronous servomotors DBL/DBK - BIBUS SK, sro
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Kollmorgen 01/2004 Installation / Setup<br />
The following notes should help you to carry out the assembly and wiring in an appropriate<br />
sequence, without overlooking anything.<br />
Site<br />
Ventilation<br />
Assembly<br />
Cable selection<br />
Earthing<br />
Shielding<br />
Wiring<br />
Check<br />
The site must be free of conductive and aggressive material.<br />
For V3-mounting (shaft end upwards), make sure that no liquids can<br />
enter the bearings. If an encapsulated assembly is required, please<br />
consult our applications department beforehand.<br />
Ensure an unhindered ventilation of the motors and observe the permissible<br />
ambient and flange temperatures.<br />
For ambient temperatures above 40°C please consult our applications<br />
department beforehand.<br />
During assembly, take care that the motor is not overstressed when it<br />
is fixed in place.<br />
Select cables according to EN 60204<br />
See the table in chapter II.1 when cable length exceeds 25m.<br />
Use correct earthing and EMC-shielding according to the Installation<br />
instructions for the servoamplifier which is used. Earth the mounting<br />
plate and motor casing. For connection methods see chapter II.2.1.<br />
— Route power cables as separately as possible from control cables<br />
— Connect up the resolver or encoder.<br />
— Connect the motor leads, install motor chokes close to the<br />
— servoamplifier, connect shields to shielding terminals or EMC<br />
— connectors at both ends<br />
— Connect the holding brake, if used, Connect shielding at both ends.<br />
Final check of the installed wiring, according to the wiring diagram<br />
which was used<br />
Servomotors <strong>DBL</strong>/<strong>DBK</strong> 15