12.07.2015 Views

Public Rights of Way Report - Chiltern Evergreen3

Public Rights of Way Report - Chiltern Evergreen3

Public Rights of Way Report - Chiltern Evergreen3

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 5.1:<strong>Chiltern</strong> Railways Bicester to Oxford: Affected <strong>Public</strong> <strong>Rights</strong> <strong>of</strong> <strong>Way</strong> andRail CrossingsAffected Level Crossings and <strong>Public</strong> <strong>Rights</strong> <strong>of</strong> <strong>Way</strong>Footpath/Crossing NameFootpath Reference NumberNorth <strong>of</strong> Gavray Drive FP 129/3Tubbs Lane FP 129/3London Road Level CrossingHighwayLangford Lane Level CrossingHighwayElm Tree Farm Number 1 FP 398/6Merton Foot FP 398/3Wendlebury Foot FP 398/2Beebont Bridleway BR 157/4Oddington Foot FP 318/6Yew Tree Farm FP 318/2Oddington Level CrossingHighwayIslip Foot FP 318/7Oddington Number 5 FP 318/5Islip Number 4 FP 260/4Islip Level CrossingHighwayWater Eaton Number 5 BR 229/5Gosford and Water Eaton Number 4 FP 229/4Gosford and Water Eaton Number 10 FP 229/10BASELINE CONDITIONS5.4 This section <strong>of</strong> the report describes the character, condition and usage <strong>of</strong> theexisting railway crossings and the rights <strong>of</strong> way that cross them. The baselineinformation has been collated from a number <strong>of</strong> primary and secondarysources, including site visits between February and August 2009, a survey <strong>of</strong>users in June 2009 and September 2009, plus data from the Oxfordshire <strong>Public</strong><strong>Rights</strong> <strong>of</strong> <strong>Way</strong> Definitive Map and Statement (2006).5.5 A survey <strong>of</strong> the number <strong>of</strong> rights <strong>of</strong> way users on the level crossings whereclosure and diversion has been proposed was undertaken on Sunday 14 June2009. The location and duration <strong>of</strong> the surveys is set out in Table 5.2. The fullresults <strong>of</strong> the surveys are set out in Annex D.ENVIRONMENTAL RESOURCES MANAGEMENT24CHILTERN RAILWAYS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!