12.07.2015 Views

Public Rights of Way Report - Chiltern Evergreen3

Public Rights of Way Report - Chiltern Evergreen3

Public Rights of Way Report - Chiltern Evergreen3

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Langford Lane Level Crossing6.16 The level crossing at Langford Lane is to be closed. A new road is to beprovided to the south <strong>of</strong> the existing level crossing. The proposed alignmentand design <strong>of</strong> the road and the bridge over the railway is shown in drawing5083741-RLS-BOX-CBR-08543 in Annex F. The alignment <strong>of</strong> the road has beendesigned in order to avoid the Alchester Scheduled Ancient Monument whichcovers a large area in the vicinity <strong>of</strong> Langford Lane. This alignment wasdevised as a result <strong>of</strong> consultation with English Heritage who advised thatconstruction <strong>of</strong> a bridge and connecting highway within the area <strong>of</strong> the SAMwould be unacceptable.6.17 The new road will provide access to residential properties and the equestrianbusiness to the east <strong>of</strong> the railway. The new road will add an additionalkilometre to journeys for people who would otherwise have used theLangford Lane level crossing. Figure G1 in Annex G shows the alignment <strong>of</strong>the new road. Currently the distance between points A and B is 1.05kilometres on the existing road alignment. This increases to 2.05 kilometreswith the new alignment.6.18 There are no footpath diversions proposed.Elm Tree Farm Number 1 [FP 398/6]6.19 The current crossing at Elm Tree Farm Number 1 is to be closed along with ashort stretch <strong>of</strong> the footpath to the east <strong>of</strong> the railway [FP 398/6]. Walkers willbe diverted along a new footpath on the western side <strong>of</strong> the railway to thereplacement bridge for Langford Lane where there will be stepped access ontothe new road bridge. Pedestrians will cross the railway using the bridgebefore rejoining the footpath on the eastern side <strong>of</strong> the railway.6.20 The alignment <strong>of</strong> the new footpath and the proposed diversion is shown onFigure G1 in Annex G. Currently the distance between points C and D via theexisting footpath is 305 metres. With the proposed diversion this will increaseslightly to 405 metres.Merton Foot [FP 398/3]6.21 A new stepped footbridge is to be constructed over the railway in thislocation. The design <strong>of</strong> the footbridge is shown in drawing 5083741-RLS-BOX-CBR-08561 in Annex F. It will be a metal structure with two flights <strong>of</strong> steps oneither side <strong>of</strong> the bridge and a parapet along the span crossing the railway.ENVIRONMENTAL RESOURCES MANAGEMENT35CHILTERN RAILWAYS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!