12.07.2015 Views

Public Rights of Way Report - Chiltern Evergreen3

Public Rights of Way Report - Chiltern Evergreen3

Public Rights of Way Report - Chiltern Evergreen3

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Name:Islip FootOS Grid Ref: SP 53876 15626Railway Ref.:Type:Function:Usage:OXD 24m 30ch<strong>Public</strong> Footpath<strong>Public</strong> footpath (recreational)Appears very lightly used.Proposal: Close crossing and provide new footpath link on southeast side <strong>of</strong> railway to new bridge proposed at site <strong>of</strong> Oddington No. 5crossing. (Existing footpath network provides suitable link on northwest side <strong>of</strong> railway).Alternativesconsidered andreasons for dismissal:1. Replace with footbridge at site <strong>of</strong> crossing – low levels <strong>of</strong> usage and proximity to proposed bridge to replace Oddington No. 5crossing mean that cost and visual impact <strong>of</strong> separate structure cannot be justified2. Retain and upgrade crossing - undesirable due to increased safety risk resulting from increased speed and frequency <strong>of</strong> trains.Key considerations in determining proposal:3. Close full length <strong>of</strong> footpath without direct replacement – although an alternative route exists via the proposed Oddingtonbridge, the alternative route is via public road. Although the public road is lightly used, the impact on footpath users isconsidered less desirable than the proposed solution.Railway engineeringand operations:Land and property:Planning:Ecology:Retention <strong>of</strong> crossing undesirable from safety point <strong>of</strong> view. Access difficulties for bridge construction.Small areas <strong>of</strong> third party land potentially required for footbridge construction.Potential visual impact <strong>of</strong> bridge.Badgers known to be in vicinity <strong>of</strong> crossing. Solution to take account <strong>of</strong> impact.ENVIRONMENTAL RESOURCES MANAGEMENT CHILTERN RAILWAYSA12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!