<strong>Hardware</strong> Operation ManualBattery conditioning is automatic. There are no manual procedures for battery conditioningor preconditioning to be performed by the user.In order to make sure all the capacity is available for your battery cells, allow thebattery cell to be fully charged when installed for the first time. The first time charge ofa battery cell takes about 24 hours to be fully charged.Removing the Battery Backup ModuleThe battery module will need to be removed for one of the following reason:Disconnect battery module if there is a long storage period before deploymentThe LI-ION battery will no longer accept a charge properly.51