12.07.2015 Views

Install/Operation - Thermal Products Inc

Install/Operation - Thermal Products Inc

Install/Operation - Thermal Products Inc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Trinity │<strong>Install</strong>ation and <strong>Operation</strong> InstructionsTft SeriesVent/Air-inlet Pipe Length DeterminationUse Table 4-5 to determine the maximum pipe length that can be used. The table calculates 90º elbows, and 45ºelbows at 5 equivalent feet each.Example: When using 3” pipe, a Tft60-110 can be installed with 150 equivalent feet of air-inlet piping and 150equivalent feet of exhaust-vent piping. See Table 4-5 for more details.When operating on Propane, models Tft60-110 require a minimum vent/air-inlet length of6’ and 11’ for 2” and 3” venting respectfully.Table 4-5 Allowable Vent and Air-inlet Pipe Size and LengthsPipeLengthNumber of Elbows (90’s or 45’s) and Equivalent FeetModel No.GasSize(ft) 1 2 3 4 5 6 7 8 9Tft60-110 NG 100 95 90 85 80 75 70 65 60 55Tft60-85 2” 1 35 30 25 20 15 10 5 - - -LPTft11025 20 15 10 5 - - - - -Tft60-110 150 145 140 135 130 125 120 115 110 1053”Tft155-250NG/LP 100 95 90 85 80 75 70 65 60 55Tft300-399 4”Note:1 See WARNING below.100 95 90 85 80 75 70 65 60 55PVC Exhaust Venting – When using 2” PVC venting with models Tft60-110, the firstseven (7) equivalent feet of exhaust venting must be approved 2” CPVC or 3” PVC; seeexceptions in Table 4-4 and Figures 4-2b and 4-2d.16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!